The Las Vegas Review Journal did an article about the new restaurants opening in Downtown Las Vegas, three of which Breslin Builders provided both design and construction services for, as well as the facade remodel.

Breslin Builders last restaurant in the Sears Retail building at 7th and Carson is finishing up and getting ready to open in a few weeks. As with the other two restaurants (Glutton and Vegenation), as well as the facade remodel, Breslin Builders provided design-build services for this project. Below are some progress photos of the interior finishes.
Breslin Builders has provided design-build services for not only the shell facade remodel, but also all three of the restaurants mentioned in this article. We look forward to finally being able to complete this work once NV Energy provides the needed power upgrades to the building. In addition to the shell and the restaurants, we also provided some interior finish updates to the existing barber shop, A Cut Above, that remains at the building.
http://www.reviewjournal.com/business/economy/downtown-redevelopment-backs-3-new-restaurants

Breslin Builders is getting closer to completing the Sears Retail project and the associated restaurants, including Glutton and Vegenation. We received meter tags from the City of Las Vegas and meters have been set by NV Energy. The long anticipate electrical work to connect the needed upgraded power is due anytime from NV Energy, based on their install schedule, which will allow us to finalize the shell and restaurant projects for final approvals and occupancy.
Zydeco Po-Boys Restaurant is taking shape also with the build-out in the rough framing, rough electrical, mechanical, and plumbing stages.
Progress photos are below:

Breslin Builders is progressing with the updates to the Sears Retail Center, including the work on the exterior facade and site changes and upgrades, as well as the interior restaurant build-outs for Glutton and Vegenation. The last part of the facade work at the west end expansion is being completed in preparation for the interior work of Zydeco Po-Boys Restaurant to take place, which the building permits have finally been approved by the City of Las Vegas. Once we have the upgraded power feeds installed by NV Energy, we can complete the balance of the open items and prepare for final completions.
Interior and exterior progress photos are below:
The design is done and plans have been submitted for the third and final restaurant space at the existing Sears building located at 7th and Carson. Breslin Builders is currently providing construction services for the shell remodel and two other restaurant spaces (Glutton and Vegenation), which we previously provided design services also.
Zydeco Po-Boys will be the smallest of the three restaurant spaces and will provide Cajon style cuisine in a walk-up order counter and “to-go” format. A small dining space has been provided for those wanting to dine in. A full service kitchen has been specifically designed for this space including preparation areas for various on-site made items including sausages, gumbo, and other Cajun cooking. Design features include exposed concrete floors, reclaimed wood accent walls, brick veneering accent walls, and exposed ceilings.
Look for this space to join the others first quarter 2015, providing one more variety of cuisine along Carson Avenue in downtown Las Vegas.