Winchell’s Restroom Add | July 2024 Final

Breslin Builders has completed work on a new restroom addition to their existing Winchell’s Pub and Grill in North Las Vegas, Nevada. The addition of this single-use restroom will allow families to dine at the facility (per SNHD requirements) due to the location of the existing restrooms adjacent to the bar.

This addition was added to the existing enclosed patio area. Given the location, this restroom was constructed to be fully enclosed and similar to a new building, including a full roof system. The exterior walls were finished to match the existing patio walls.

Winchell’s Restroom – Before Photo
Winchell’s Restroom – After Photo

Winchell’s Bar and Grill Restroom Add | April 2024 Update

Breslin Builders has started the restroom addition to the existing Winchell’s Bar and Grill in North Las Vegas, Nevada. This is a project for ECL Gaming, for which we also provide design-build services for their Jackpot Joanie’s and Lucky 7’s locations (as well as completed their corporate office recently).

This project adds a single-use ADA-accessible restroom in the existing enclosed patio area (a building within the patio area). Due to the interior bar configuration and the past indoor clean air requirements, the existing tavern restrooms were not legally accessible to the families wishing to dine at the restaurant. This addition will satisfy the SNHD’s access requirement allowing all to dine at the establishment.

Breslin Builders is pleased to provide continued services for ECL Gaming. The project is anticipated to be finished by July 2024.