Station Plaza Storage | Design-Build July 2023

Breslin Builders is providing design-build services for a new multi-story multi-building storage facility to be constructed on an existing pad at the Station Plaza shopping center, anchored by a Walmart Supercenter. Land-use approvals were recently granted by the City of North Las Vegas Planning Commission. The project will contain 808 storage units of various sizes and across the three different buildings.

Lake Mead Storage | May 2023 Progress

We are getting closer to the finish line on this project. Exterior building finishes are nearing completion. The interiors are making great progress also. The site work is progressing with the concrete flat work being installed in preparation for new pavement.

Progress photos are below:

Mini-Storage at Horizon | Contract Award

Breslin Builders has been awarded another self-storage facility in the Las Vegas valley. This one is in Henderson, Nevada and located on Horizon Ridge Parkway. The three multi-story structures will provide a new option for self-storage in this part of the valley include a dedicated wine storage facility.

 

The site take advantage of the terrain with two of the structure having walk-out basement style buildings. The project is situated on an infill lot, the last in this area, when has upgraded exteriors and added landscape provide features to integrate into the surround neighborhood.

 

Construction will start in March 2021 and is expected to run 14-15 months before being ready for occupancy.

 

 

Mini-Storage at Revere | July 2020 Progress

Breslin Builders progresses the new self-storage project on Revere Street (south of Craig Road) in North Las Vegas.  The multi-building project, including a large 3-story facility, is slated for completion in September/October 2020.

 

Progress photos are below:

 

All-Storage Inspirada | April 2018 Progress

Progress continues on the All-Storage Inspirada project.  The third level is framed, roof insulation and panels are being installed, the manager’s apartment is framed with rough-ins starting, site CMU fencing is starting, and finished mechanical and electrical installations are taking place in the storage areas.

Progress photos are below:

All-Storage I-15 Progress | March 2018

The All-Storage I-15 project site work is progressing including installation of the underground on-site utilities.  The building pads are also being prepared.

This marks the second mini-storage project we will be completing for All-Storage, and yet another mini-storage project to add to many others we have completed over the years.

Progress photos below:

All-Storage Inspirada Progress | March 2018

Breslin Builders has made progress on the All-Storage Inspirada project in Henderson, Nevada.  The third floor framing is progressing, site work and grading is taking place, structural steel is in place, and masonry work is finished.

Progress photos are below: