The courts replaced traditional tennis courts (all but one) and allowed for The Plaza to have numerous courts for their tournament, as well as everyday use. The roof top deck area originally has two full size tennis courts, a basketball court, and a hard surfaced volleyball court. Breslin Builders cleaned the existing surfaces, fixed the numerous cracks in the deck area, rewaterproofed the area, and provided a new court surface and specific markings for each area.
“The Pool at the Plaza” is finally open and we have some pre-opening photos of the 70,000 square foot transformation into a modern with a vintage Palm Springs twist. Completed by Breslin Builders as a design-build project, working daily with the property to ensure their needs are met, we delivered an updated and renovated pool deck area that will last the Plaza Hotel and Casino for decades to come.
The project included a complete renovation of their roof top deck area, a new swimming pool, adding a 12 person spa, new cabanas, new patio areas with room access, updated tennis and Pickleball courts, new bar area, new outdoor gaming area, new shade structures, a full size food truck, and open areas for lounging, gathering, and events including a place and connections for a stage set up.
More information about the pool deck can be found on the Plaza’s website here!
After months of planning, designing, and construction, Breslin Builders has substantially completed the design-build pool renovation and upgrade project for The Plaza Hotel and Casino in downtown Las Vegas, Nevada.
Check out this Las Vegas Sun article about the Preview Party the property held on June 23rd.
The pool officially opens on July 2nd. In the mean time, Breslin Builders will put the finishing touches on this multi-million dollar project. We have taking some photos of our own and will upload them once they are prepared.
The food truck for the new Plaza Pool renovation project was lifted to the deck area via crane. Check out this article from the Las Vegas Review-Journal about the lift.
The Plaza’s pool deck renovation project is progressing. Check out the rendering based on the owner’s concept and the design-build work Breslin Builders is providing for the project. Working closely with the property’s management, Breslin Builders is providing both design and construction services for the pool deck renovation. Permits have been issued and the work is well under way. Look for an official opening the beginning of summer time.
In addition to the rendering file of the project, a nice article was written about the project in the Las Vegas Sun – click here for the article.
Work is progressing on The Plaza Hotel and Casino’s Pool Deck Renovation, with removal of the existing topping slab, planters, old light bollards, and other existing items being removed to make way for the new pool, cabanas, patio areas, upgraded bar, and new deck areas. In addition to the upgrades, Breslin Builders is also fixing various areas of the structural system and deck that required upgrades and changes due to the age and use of the structure.
Below are some progress photos of the work in progress:
Work on the modernization and upgrades to The Plaza Hotel and Casino Pool Deck are well underway. Breslin Builders is providing design-build services for the project. Currently we are working on removing the existing concrete topping slabs, removing the old bar structures, the pool, and other items in preparation for the new and modernization work. Additionally we are adjusting and fixing a few structural items to ensure the life of the deck area continues for well into the future. Modernized and ADA accessible restrooms, bar, and a new pool are part of the project scope also.
In addition to the selective demolition work, Breslin Builders is working to obtain the needed City of Las Vegas renovation building permits for the balance of the work. Given the age and uniqueness of the project, we are blending the new 2012 IBC code requirements with the original 1967 UBC requirements to come to an acceptable solution, ensuring both safety and sensibility are achieved. The original pool portion of the structure was constructed in 1981. Look for a summer 2016 opening.
Breslin Builders has been contracted to provide design-build remodel and upgrade services for the renovated pool deck area at The Plaza Hotel & Casino. Anticipated to open for the 2016 Summer pool season, Breslin Builders is working closely with The Plaza to provide a unique venue fitting for The Plaza, while keeping budgets and costs in check. Breslin Builders will be providing both design and construction services for the project.
Check out this Vegas Inc. article about the project: