The Lake Mead Self Storage (a CubeSmart operator) project completed for GK Real Estate at the Lake Mead Crossings in Henderson, Nevada has been completed.
Some final photos can be found on our Flickr site.
The Lake Mead Self Storage (a CubeSmart operator) project completed for GK Real Estate at the Lake Mead Crossings in Henderson, Nevada has been completed.
Some final photos can be found on our Flickr site.
Breslin Builders is providing design-build services for a new multi-story multi-building storage facility to be constructed on an existing pad at the Station Plaza shopping center, anchored by a Walmart Supercenter. Land-use approvals were recently granted by the City of North Las Vegas Planning Commission. The project will contain 808 storage units of various sizes and across the three different buildings.
Breslin Builders has been actively working on a tenant improvement remodel of an existing retail space at the Silverado Ranch Plaza at Eastern and Silverado Ranch in Las Vegas, Nevada. The former 4,288 square foot T-Mobile space is being transformed into a Carter’s For Kids and OSHKOSH co-branded location.
Breslin Builder is providing the landlord work for the tenant improvement. Worked started in June 2023 and is nearing completion in August. Dan Stuart Davis, Architect is the architect of record for the project.
Our scope includes selective demolition of the existing space, new restrooms, open retail space, and back-of-house areas ready for the tenant to install the needed sales fixture and other tenant supplied items for the retail store.
Project progression photos are below:
Breslin Builders is starting the construction documents for a new multi-story 113 unit apartment project in downtown Las Vegas, Nevada. This design-build project, being completed for InvestarUSA, will be located at the northeast corner of 8th Street and Bonneville Avenue. Consisting of a three-level parking structure (one to be subterranean), with four level so of apartments on top of the podium, this project will add needed residential units in the downtown area, helping further the City’s development and redevelopment of the downtown area. The project already has received City Council approval. We anticipate breaking ground in the 2nd Quarter 2024 once the needed building permits are issued.
Our Gipsy Nightclub project keeps moving along. Interior finishes are being installed, as well as exterior site work is progressing. Breslin Builders is working with the owner on some owner updates and changes to help bring their vision for the space to reality.
Progress photos are below:
We are getting closer to the finish line on this project. Exterior building finishes are nearing completion. The interiors are making great progress also. The site work is progressing with the concrete flat work being installed in preparation for new pavement.
Progress photos are below:
Our latest design-build multi-family project, shareDOWNTOWN Fremont East (aka shareDOWNTOWN at 11th) has officially been opened and residents are making it their new home. Mayor Carolyn Goodman, Councilman Cedric Crear, and other guests and dignitaries joined the shareDOWNTOWN team for a grand opening event in the second-level courtyard area, including a few speeches and a fashion show.
More information about the property can be found here.
Check out this News3 article about the event – click here.
We are wrapping up our second shareDOWNTOWN project for Cherry Development. This one is shareDOWNTOWN East Fremont (at 11th and Stewart). The finishing touches on the interiors, site work, and other items are being completed.
More information about shareDOWNTOWN can be found here.
Progress photos are below:
Our latest Henderson Nevada storage project is progressing with exterior and interior finishes being installed. Check out our progress photos below.
We are nearing the end of the project with final finishes, site work, and other completion items being completed. Check out the progress photos below.
Much has taken place since our last update and progress is being made on the metal framing and structure of the facility. The framing of 3rd level of this Henderson, Nevada storage facility is being completed. Mechanical, plumbing, and electrical work is progressing on the 1st and 2nd levels. Hallway systems are being installed on the 1st level.
Progress photos and a video area below:
Current progress includes the preparation for the stucco exterior finish, interior units getting gypsum board installed, roofing is installed, and mechanical units are set on the roof ready for connections. We are getting ready for a 1st Quarter finish so new tenants can move in.
Breslin Builders is pleased to have partnered with Cherry Development on his past projects and looks forward to adding another one to the list. This one will be in the Historic Westside part of downtown Las Vegas at Jefferson and D St. This project will be similar to the other Share projects we have designed and constructed, but will add additional commercial space to the project, bring much needed retail style space to the area.
Check out this RJ article for the next apartment project we will be teaming up with Cherry Development to complete.
More information on shareDOWNTOWN can be found here.
Work is progressing on the 601 Bridger Main Level TI office project. This is a design-build project to complete the buildout of the Schwartz Building at 601 Bridger. We previously completed the upper-level law office area (entire floor) and the Brew It coffee shop (main level). This project will finish building out the main level and provide more law office space. The finishes and appearance will be similar to what we completed on the upper level.
Progress photos are below:
The wood framing has progressed and the interior walls are being added. Additionally, the interior rough-ins for the plumbing, mechanical, and electrical are progressing.
Progress photos are below:
Framing for the various floor levels and units is taking shape. Rough-ins for the plumbing and electrical trades are also progressing. Stairs are being installed to each level also.
The slab have been poured on the new self-storage facility we are constructing in Henderson, Nevada. This is a hugh milestone in progressing the project.
Progress photos are below:
Site work and finishes for the various buildings continues at the storage project.
Progress photos are below:
We have progressed to the podium level of the project and are getting things ready for the elevated slab pour. Inserts and embeds are being placed, slab reinforcement has started, progressing to a slab pour.
Our work on the new Gipsy Nightclub is progressing and underground work before the slab pour is being completed.
More information about the project can be found here.
Progress photos are below: