Lake Mead Storage | May 2023 Progress

We are getting closer to the finish line on this project. Exterior building finishes are nearing completion. The interiors are making great progress also. The site work is progressing with the concrete flat work being installed in preparation for new pavement.

Progress photos are below:

Lake Mead Storage | January 2023 Progress

Much has taken place since our last update and progress is being made on the metal framing and structure of the facility. The framing of 3rd level of this Henderson, Nevada storage facility is being completed. Mechanical, plumbing, and electrical work is progressing on the 1st and 2nd levels. Hallway systems are being installed on the 1st level.

Progress photos and a video area below:

Lake Mead Storage | June 2022 Progress

We have started another multi-story self-storage facility in the Las Vegas valley. This 3-story single-building project is in Henderson Nevada at the Lake Mead Crossing Shopping Center at Lake Mead Parkway and Water Street.

Earthwork and initial underground utility work is currently progressing. The project is expected to be completed 2nd Quarter 2023.

Progress photos are below:

Desert Storage | Final Photos

Our self-storage project at Eastern and Sunridge in Henderson, Nevada is completed and has opened for business. Formerly mentioned as Easter Storage, this multi-story, multi-building complex is tucked in behind and existing retail center, completing what was a large area of undeveloped land in 2018.

Breslin Builders has become the go to general contractor for self-storage projects. This project is one of four recently projects we have either finished or have under construction in the Las Vegas valley.

Below are some photos of the project’s exterior:

Mini-Storage at Horizon | Contract Award

Breslin Builders has been awarded another self-storage facility in the Las Vegas valley. This one is in Henderson, Nevada and located on Horizon Ridge Parkway. The three multi-story structures will provide a new option for self-storage in this part of the valley include a dedicated wine storage facility.

 

The site take advantage of the terrain with two of the structure having walk-out basement style buildings. The project is situated on an infill lot, the last in this area, when has upgraded exteriors and added landscape provide features to integrate into the surround neighborhood.

 

Construction will start in March 2021 and is expected to run 14-15 months before being ready for occupancy.

 

 

theBLOQparq Announcement

Breslin Builders has been selected as part of the development team involved on a new and exciting, as well as unique, project being developed in the City of Henderson, Nevada at the intersection of Boulder Highway and Sunset. Chosen for our experience in similar project types, including our highly successful design-build efforts provided for the Downtown Container Park, and our relationship with Xtreme Cubes, we are ready to lend our insight, design-assist services, and ultimately be the general contractor of record for theBLOQparq project.

 

More information about the project and team can be found on their recently launched website – https://thebloqparq.com

 

We look forward to breaking ground in 2021!

 

Winchell’s Pub & Grill Eastern | July 2020 Progress

Breslin Builders is providing refresh and update design-build services for the existing Winchell’s Pub & Grill located at 10620 S. Eastern Ave. in Henderson, NV.  We are refreshing the kitchen area, the bar area, and the dining room areas.  Future improvements will also include an update to the patio area.

Progress photos are below:

Eastern Storage Center | July 2019 Progress

Breslin Builders has begun the site work for a new self-storage facility to be located at Eastern and Horizon Ridge in Henderson, Nevada.  The initial work includes deep over excavations of the existing soils in preparation for final grading and building pads.  The multi-level self-storage facility, along with the ample covered exterior RV and boat parking area, is anticipated to be completed in 2nd quarter 2020.

Progress photos are below:

Mesa Oils | September 2018

Breslin Builders has been retained to provide design-build services for a new marijuana production and extraction facility in Henderson, Nevada.  Breslin Builders provided the initial documents needed for State of Nevada and City of Henderson approvals to open within the existing office/warehouse space.

The new work will include a full build out of the open unfinished warehouse space and will include both expanded extraction areas and a large production area for infused products.

Construction documents are currently being prepared for submittal to the City of Henderson in October 2018.

 

 