Mini-Storage at Horizon | July 2021 Progress

Building 2’s slab is in place, Building 1’s walls are cast, and Building 3’s slab work is progressing! Much has changed since our last post about the Mini-Storage at Horizon project. Tracks for wall framing on Building 2 are being placed. Building 1’s final slab preparation is taking place.

Jackpot Joanie’s HS | June 2021 Update

Our latest Jackpot Joanie’s location completed for Eclipse Gaming is complete and opened today! This is our third location we have provided design-build services for Eclipse Gaming and have at least two more locations in progress. Below are photos from their pre-opening to get the place ready for there customers this afternoon. Final photos will follow once we have these ready.

Stop of by and visit their newest location at the end of Sunset and Hualapai, 6420 S. Hualapai Way, Las Vegas, Nevada.

Mini-Storage at Horizon | May 2021 Progress

A lot has changed on the mini-storage project in Henderson, Nevada being constructed for Hugh Horne of HPI. CT Equipment has been able to transform what was once a remaining parcel with a wash, black Henderson rock, and lots of large rocks and boulders into a site that will have three separate self-storage buildings. This project is slated to be completed Summer of 2022.

601 Bridger Offices | October 2020 Progress

Our design-build offices on the second level of the 601 Bridger building, located at the southeast corner of 6th Street and Bridger Avenue in downtown Las Vegas is reaching completion.

 

The new law office project contains over 7,000 square feet of high-end finishes and methods including polished concrete floors, level 5 smooth walls, recessed and pendant lighting, high-gloss cabinet finishes, decorative wall tiles, just to name a few.  The project encompasses the entire second level of the two-story building.

 

Breslin Builders is providing both the design and construction of the project.

 

Progress photos are below:

 

theBLOQparq Announcement

Breslin Builders has been selected as part of the development team involved on a new and exciting, as well as unique, project being developed in the City of Henderson, Nevada at the intersection of Boulder Highway and Sunset. Chosen for our experience in similar project types, including our highly successful design-build efforts provided for the Downtown Container Park, and our relationship with Xtreme Cubes, we are ready to lend our insight, design-assist services, and ultimately be the general contractor of record for theBLOQparq project.

 

More information about the project and team can be found on their recently launched website – https://thebloqparq.com

 

We look forward to breaking ground in 2021!