Airport Self Storage | October 2021

Breslin Builders has been engaged to provide design-build services for a new multi-story self storage facility in the Southwest part of the Las Vegas valley. The project consists of various unit sizes across 130,000 square feet of floor space. The project is designed to take advantage of the location and will cater to both local residents, local businesses, but also the tourist and timeshare market, allowing ease of access from the airport and rental car facility.

Breslin’s in-house design group completed conceptual designs and we will be moving into the entitlement and construction documentation phases next. Construction is slated to start 3rd Quarter 2022.

Renderings of the project are below:

Lucky 7’s at Trop and Jones | September 2021 Progress

We have started the interior remodel work converting an old Irene’s Lounge into a new Lucky 7’s tavern. This project is owned by the same client that we have completed Jackpot Joanie’s for, as well as currently constructing their new corporate offices, Ron Winchell and Eclipse Gaming. Breslin Builders is providing both design and construction services for this project.

The initial phase involved gutting the existing shell space in preparation for the new work. The existing bar, kitchen, restrooms, and other related spaces have been removed to make way for the new tavern use.

Brew It Coffee at 601 Bridger | May 2021 Progress

Progress is well underway for a new coffee shop in downtown Las Vegas. Breslin Builders provided design-build services for the Brew It Coffee shop at 601 Bridger (corner of 6th Street and Bridger in downtown). The project is a continuation of other work we have completed over the past year including the entire upper level of the building for Schwartz Law‘s new office. We are also completing lobby and restroom upgrades on the main level, as well as creating a space for future tenant improvements on the main level.

Winchell’s Pub & Grill Eastern | July 2020 Progress

Breslin Builders is providing refresh and update design-build services for the existing Winchell’s Pub & Grill located at 10620 S. Eastern Ave. in Henderson, NV.  We are refreshing the kitchen area, the bar area, and the dining room areas.  Future improvements will also include an update to the patio area.

Progress photos are below:

shareDOWNTOWN Apartments | September 2019

Concrete foundation work is progressing on the 63 unit mixed-use apartment project Breslin Builders is providing design-build services for.  The downtown located project at Casino Center and Colorado is on track for a 2nd quarter completion in 2020.

Progress photos are below:

shareDOWNTOWN Apartments | August 2019 Progress

Grading is completed and underground plumbing and site utility work is progressing on the 63 unit mixed-use apartment project Breslin Builders is providing design-build services for.  The downtown located project at Casino Center and Colorado is on track for a 2nd quarter completion in 2020.

Progress photos are below:

shareDOWNTOWN Apartments | July 2019 Progress

Site work has begun on the new multi-story mixed used apartment project in downtown Las Vegas, Nevada.  The project will have two ground floor retail spaces, enclosed on grade parking, and 3-levels of apartments above the concrete podium consisting of 63 units total.  Each unit is designed as a studio apartment containing approximately 480 square feet each.  The project also has three community/gathering rooms.  Located at the southwest corner of Casino Center Boulevard and Colorado Avenue, the project is anticipated to be completed April/May 2020.  Breslin Builders provided design-build services for the project.

Progress photos are below:

Lotus of Siam | Flamingo – Open for business

The new Lotus of Siam at 620 E. Flamingo, a remodel that Breslin Builders has recently completed for the restaurant, has opened.  We are excited to provide our design-build services at their new location.

Check out this ReviewJournal.com article about the opening – click here.

In addition to the full remodel work,  we will also be completing an additional climate controlled wine room in the private dining room.  We will also be starting the design and construction services on their previous location at Commercial Center on Sahara Avenue to renovate and restore it for operations again.

Photos of the new space are to follow also.

The Pool at the Plaza – Project Photos

“The Pool at the Plaza” is finally open and we have some pre-opening photos of the 70,000 square foot transformation into a modern with a vintage Palm Springs twist.  Completed by Breslin Builders as a design-build project, working daily with the property to ensure their needs are met, we delivered an updated and renovated pool deck area that will last the Plaza Hotel and Casino for decades to come.

The project included a complete renovation of their roof top deck area, a new swimming pool, adding a 12 person spa, new cabanas, new patio areas with room access, updated tennis and Pickleball courts, new bar area, new outdoor gaming area, new shade structures, a full size food truck, and open areas for lounging, gathering, and events including a place and connections for a stage set up.

More information about the pool deck can be found on the Plaza’s website here!

More photos of this project can be found in an album on our Flickr site.

More photos of other projects can be found on our Flickr site.

Plaza Hotel & Casino in Las Vegas, Nevada - Pool Deck Renovation 2016

Plaza Hotel & Casino in Las Vegas, Nevada – Pool Deck Area

Plaza Hotel & Casino in Las Vegas, Nevada - Pool Deck Renovation 2016

Plaza Hotel & Casino in Las Vegas, Nevada – Pool Deck and Cabanas

Plaza Hotel & Casino in Las Vegas, Nevada - Pool Deck Renovation 2016

Plaza Hotel & Casino in Las Vegas, Nevada – Pool Deck Renovation

Plaza Hotel & Casino in Las Vegas, Nevada - Pool Deck Renovation 2016

Plaza Hotel & Casino in Las Vegas, Nevada – Lounge and Food Truck

Plaza Hotel & Casino in Las Vegas, Nevada - Pool Deck Renovation 2016

Plaza Hotel & Casino in Las Vegas, Nevada – Gaming Area

Plaza Hotel & Casino in Las Vegas, Nevada - Pool Deck Renovation 2016

Plaza Hotel & Casino in Las Vegas, Nevada – Pool

Plaza Hotel & Casino in Las Vegas, Nevada - Pool Deck Renovation 2016

Plaza Hotel & Casino in Las Vegas, Nevada – Bar Accent Wall

Plaza Hotel & Casino in Las Vegas, Nevada - Pool Deck Renovation 2016

Plaza Hotel & Casino in Las Vegas, Nevada – Bar Area

Plaza Hotel & Casino in Las Vegas, Nevada - Pool Deck Renovation 2016

Plaza Hotel & Casino in Las Vegas, Nevada – South Lounge Area

Plaza Hotel & Casino in Las Vegas, Nevada - Pool Deck Renovation 2016

Plaza Hotel & Casino in Las Vegas, Nevada – Raised Spa Area

Plaza Hotel & Casino in Las Vegas, Nevada - Pool Deck Renovation 2016

Plaza Hotel & Casino in Las Vegas, Nevada – Spa and Seating Area

Plaza Hotel & Casino in Las Vegas, Nevada - Pool Deck Renovation 2016

Plaza Hotel & Casino in Las Vegas, Nevada – Outdoor Gaming Area

Plaza Hotel & Casino in Las Vegas, Nevada - Pool Deck Renovation 2016

Plaza Hotel & Casino in Las Vegas, Nevada – Seating Area

Plaza Hotel & Casino in Las Vegas, Nevada - Pool Deck Renovation 2016

Plaza Hotel & Casino in Las Vegas, Nevada – Pool and Cabanas

Plaza Hotel & Casino in Las Vegas, Nevada - Pool Deck Renovation 2016

Plaza Hotel & Casino in Las Vegas, Nevada – South Deck Area

Plaza Hotel & Casino in Las Vegas, Nevada - Pool Deck Renovation 2016

Plaza Hotel & Casino in Las Vegas, Nevada – Raised Seating Area

The Plaza – Pool Deck Renovation – Rendering

The Plaza’s pool deck renovation project is progressing.  Check out the rendering based on the owner’s concept and the design-build work Breslin Builders is providing for the project.  Working closely with the property’s management, Breslin Builders is providing both design and construction services for the pool deck renovation.  Permits have been issued and the work is well under way.  Look for an official opening the beginning of summer time.

The Plaza - Pool Deck - Conceptual Rendering

In addition to the rendering file of the project, a nice article was written about the project in the Las Vegas Sun – click here for the article.

WVC Oquendo Center Autoclave Project

Breslin Builders is providing continued design and construction services for the WVC Oquendo Center facility, located on Eastern and Oquendo in Las Vegas, Nevada, by providing the needed building modifications and additions for a new full size walk through autoclave installation.  The autoclave will allow for faster and more efficient cleaning on the various equipment, tools, and other items used during their veterinarian and medical education classed provided at the world class facility.  Breslin Builders assisted with the initial design and provided construction services for the facility.

Working with Getinge for the autoclave machine, Breslin Builders provided the needed documentation for permits from Clark County Building Department.  A new recessed pit, additional mechanical, plumbing, and electrical services to the machine, as well as a new prep sink and cleaning area are being provided within the existing facility.  Working closely with the facility managers, we are able to provide the services needed while the facility stays operational, which generally includes a new continuing education seminar each week.

Progress photos are below:

WVC Oquendo Center Autoclave 3-24-16 - 1 WVC Oquendo Center Autoclave 3-24-16 - 2 WVC Oquendo Center Autoclave 3-24-16 - 3 WVC Oquendo Center Autoclave 3-24-16 - 4 WVC Oquendo Center Autoclave 3-24-16 - 5

Redwood Warehouse Nearing Completion

The Redwood Warehouse project is nearing completion and gearing up for the owner to install their equipment and fixtures to start working the MME cultivation facility.  Breslin Builders provided design-build services for the project, converting an existing metal building vehicle storage and maintenance facility into a new MME cultivation facility.

Progress photos are below:

Redwood Warehouse Progress 3-18-16 - 4 Redwood Warehouse Progress 3-18-16 - 5 Redwood Warehouse Progress 3-18-16 - 6 Redwood Warehouse Progress 3-18-16 - 7 Redwood Warehouse Progress 3-18-16 - 8 Redwood Warehouse Progress 3-18-16 - 9 Redwood Warehouse Progress 3-18-16 - 1 Redwood Warehouse Progress 3-18-16 - 2 Redwood Warehouse Progress 3-18-16 - 3

The Plaza Pool Deck Renovation progress

Work is progressing on The Plaza Hotel and Casino’s Pool Deck Renovation, with removal of the existing topping slab, planters, old light bollards, and other existing items being removed to make way for the new pool, cabanas, patio areas, upgraded bar, and new deck areas.  In addition to the upgrades, Breslin Builders is also fixing various areas of the structural system and deck that required upgrades and changes due to the age and use of the structure.

Below are some progress photos of the work in progress:

The Plaza Pool Deck Renovation 3-17-16 - 1The Plaza Pool Deck Renovation 3-17-16 - 2The Plaza Pool Deck Renovation 3-17-16 - 3The Plaza Pool Deck Renovation 3-17-16 - 4The Plaza Pool Deck Renovation 3-17-16 - 5The Plaza Pool Deck Renovation 3-17-16 - 6The Plaza Pool Deck Renovation 3-17-16 - 7

The Plaza – Pool Deck Renovation Progressing

Work on the modernization and upgrades to The Plaza Hotel and Casino Pool Deck are well underway.  Breslin Builders is providing design-build services for the project.  Currently we are working on removing the existing concrete topping slabs, removing the old bar structures, the pool, and other items in preparation for the new and modernization work.  Additionally we are adjusting and fixing a few structural items to ensure the life of the deck area continues for well into the future.  Modernized and ADA accessible restrooms, bar, and a new pool are part of the project scope also.

In addition to the selective demolition work, Breslin Builders is working to obtain the needed City of Las Vegas renovation building permits for the balance of the work.  Given the age and uniqueness of the project, we are blending the new 2012 IBC code requirements with the original 1967 UBC requirements to come to an acceptable solution, ensuring both safety and sensibility are achieved.  The original pool portion of the structure was constructed in 1981.  Look for a summer 2016 opening.

Progress photos are below:

The Plaza Pool Deck Renovation - 38 The Plaza Pool Deck Renovation - 39 The Plaza Pool Deck Renovation - 40 The Plaza Pool Deck Renovation - 29 The Plaza Pool Deck Renovation - 30 The Plaza Pool Deck Renovation - 31 The Plaza Pool Deck Renovation - 32 The Plaza Pool Deck Renovation - 34 The Plaza Pool Deck Renovation - 35 The Plaza Pool Deck Renovation - 36 The Plaza Pool Deck Renovation - 23 The Plaza Pool Deck Renovation - 24 The Plaza Pool Deck Renovation - 26 The Plaza Pool Deck Renovation - 11 The Plaza Pool Deck Renovation - 13 The Plaza Pool Deck Renovation - 5 The Plaza Pool Deck Renovation - 6 The Plaza Pool Deck Renovation - 8 The Plaza Pool Deck Renovation - 2 The Plaza Pool Deck Renovation - 3

Westwood Cultivation Progress

Breslin Builders continues our progress on the Westwood Cultivation MME facility in Las Vegas, Nevada.  This facility is being located within an existing warehouse structure and will have about 25% over the overall space developed in this phase, with future work and phases to be completed after opening and needed NV Energy power feed upgrades are performed.  This is our second MME cultivation project in the works, with others on the “drawing board”.  In addition to the cultivation facility, we are also providing design-build services for a fully separated production facility located at the same location.

Progress photos are below:

Westwood Progress - 14 Westwood Progress - 12 Westwood Progress - 13  Westwood Progress - 8 Westwood Progress - 10 Westwood Progress - 2 Westwood Progress - 3 Westwood Progress - 4 Westwood Progress - 5

 

Redwood Warehouse MME Progress

The mechanical, plumbing, and electrical system rough-in installations are taking shape at the Redwood Warehouse MME project in the southwest part of the Las Vegas valley.  In addition, the interior and exterior CMU working is taking place also.

Progress photos are below:

Redwood Warehouse MME Progress Photos 1-7-16 - 2 Redwood Warehouse MME Progress Photos 1-7-16 - 3 Redwood Warehouse MME Progress Photos 1-7-16 - 4 Redwood Warehouse MME Progress Photos 1-7-16 - 5 Redwood Warehouse MME Progress Photos 1-7-16 - 6 Redwood Warehouse MME Progress Photos 1-7-16 - 7 Redwood Warehouse MME Progress Photos 1-7-16 - 8 Redwood Warehouse MME Progress Photos 1-7-16 - 9 Redwood Warehouse MME Progress Photos 1-7-16 - 10 Redwood Warehouse MME Progress Photos 1-7-16 - 1

 

Lo-Lo’s Restaurant Photos 1-7-16

As the project nears completion and the owner starts to add the finishing touches of tables, art work, signage, and other items for their opening, Breslin Builders is completing our last items to complete the project.  Final inspections have been received and now the owner is working on getting things ready for their opening, anticipated for later this month.

Progress photos are below:

Lo-Lo's Restaurant Progress Photos 1-7-16 - 4 Lo-Lo's Restaurant Progress Photos 1-7-16 - 5 Lo-Lo's Restaurant Progress Photos 1-7-16 - 6 Lo-Lo's Restaurant Progress Photos 1-7-16 - 7 Lo-Lo's Restaurant Progress Photos 1-7-16 - 8 Lo-Lo's Restaurant Progress Photos 1-7-16 - 9 Lo-Lo's Restaurant Progress Photos 1-7-16 - 10 Lo-Lo's Restaurant Progress Photos 1-7-16 - 11 Lo-Lo's Restaurant Progress Photos 1-7-16 - 2 Lo-Lo's Restaurant Progress Photos 1-7-16 - 3

Theta Consulting Office Remodel

Breslin Builders is providing design-build services for a small office remodel at Eastern and Sunset for Theta Consulting.

Coming in at just over 1,200 square feet, the project consists of some remodel work within the space including the remodel of two office to create a large work space, conversion of one of the two existing restrooms to a break room, as well as other ceiling and lighting changes.

While on the smaller end of the project scale Breslin Builders typical completes, we are able to scale our services to any project size to meet our client’s needs.

The Plaza – Pool Deck Remodel – Vegas Inc. Article

Breslin Builders has been contracted to provide design-build remodel and upgrade services for the renovated pool deck area at The Plaza Hotel & Casino.  Anticipated to open for the 2016 Summer pool season, Breslin Builders is working closely with The Plaza to provide a unique venue fitting for The Plaza, while keeping budgets and costs in check.  Breslin Builders will be providing both design and construction services for the project.

Check out this Vegas Inc. article about the project:

http://vegasinc.com/business/gaming/2015/dec/29/plaza-renovating-its-rooftop-pool-in-downtown-las/

As plans progress we will post more information.