Bali Hai Tiki Bar | November 2021 Progress

Our design-build project at the Bali Hai Golf Course Club House, which is adding a new sports bar within an existing covered patio area, is progress towards the end.

Finishes are being installed including various tiki style materials, creating a fun place for a drink or food after (or before) your 18 holes of golf. Playing off the “tiki” theme, but also keep with the overall Polynesian theme of the club house and golf course, the new sports bar be your next stop in your experience at the Bali Hai Golf Course.

Breslin Builders has provided both design and construction of this newest addition to the clubhouse, which is a project we provided initial design-assist and construction services in the early 2000’s, and have provided various construction services over the past decades at the property.

Airport Self Storage | October 2021

Breslin Builders has been engaged to provide design-build services for a new multi-story self storage facility in the Southwest part of the Las Vegas valley. The project consists of various unit sizes across 130,000 square feet of floor space. The project is designed to take advantage of the location and will cater to both local residents, local businesses, but also the tourist and timeshare market, allowing ease of access from the airport and rental car facility.

Breslin’s in-house design group completed conceptual designs and we will be moving into the entitlement and construction documentation phases next. Construction is slated to start 3rd Quarter 2022.

Renderings of the project are below:

Lucky 7’s at Trop and Jones | September 2021 Progress

We have started the interior remodel work converting an old Irene’s Lounge into a new Lucky 7’s tavern. This project is owned by the same client that we have completed Jackpot Joanie’s for, as well as currently constructing their new corporate offices, Ron Winchell and Eclipse Gaming. Breslin Builders is providing both design and construction services for this project.

The initial phase involved gutting the existing shell space in preparation for the new work. The existing bar, kitchen, restrooms, and other related spaces have been removed to make way for the new tavern use.

Jackpot Joanie’s HS | June 2021 Update

Our latest Jackpot Joanie’s location completed for Eclipse Gaming is complete and opened today! This is our third location we have provided design-build services for Eclipse Gaming and have at least two more locations in progress. Below are photos from their pre-opening to get the place ready for there customers this afternoon. Final photos will follow once we have these ready.

Stop of by and visit their newest location at the end of Sunset and Hualapai, 6420 S. Hualapai Way, Las Vegas, Nevada.

Brew It Coffee at 601 Bridger | May 2021 Progress

Progress is well underway for a new coffee shop in downtown Las Vegas. Breslin Builders provided design-build services for the Brew It Coffee shop at 601 Bridger (corner of 6th Street and Bridger in downtown). The project is a continuation of other work we have completed over the past year including the entire upper level of the building for Schwartz Law‘s new office. We are also completing lobby and restroom upgrades on the main level, as well as creating a space for future tenant improvements on the main level.

Jackpot Joanie’s SE | March 2021 Progress

Our second design-build Jackpot Joanie’s location at Sahara and Eastern is nearing completion.  The old Dream Furniture location has been completely renovated into a new Jackpot Joanie’s location.  Breslin Builders provided full design-build services for this project.

 

Progress photos are below:

Jackpot Joanie’s HS | March 2021 Progress

The tenant improvement work for a new Jackpot Joanie’s at Hualapai and Sunset is progress into the finishes mode.  Ceiling grid, paint, FRP, and other items are being installed in this new location for Jackpot Joanie’s.

 

As with two prior Jackpot Joanie’s locations, Breslin Builders is providing full design-build services on this project also including in-house design and full general contracting services.

 

The project is anticipated to be finished in May | June 2021.

 

Progress photos are below:

601 Bridger Offices | October 2020 Progress

Our design-build offices on the second level of the 601 Bridger building, located at the southeast corner of 6th Street and Bridger Avenue in downtown Las Vegas is reaching completion.

 

The new law office project contains over 7,000 square feet of high-end finishes and methods including polished concrete floors, level 5 smooth walls, recessed and pendant lighting, high-gloss cabinet finishes, decorative wall tiles, just to name a few.  The project encompasses the entire second level of the two-story building.

 

Breslin Builders is providing both the design and construction of the project.

 

Progress photos are below:

 

Winchell’s Pub & Grill Eastern | July 2020 Progress

Breslin Builders is providing refresh and update design-build services for the existing Winchell’s Pub & Grill located at 10620 S. Eastern Ave. in Henderson, NV.  We are refreshing the kitchen area, the bar area, and the dining room areas.  Future improvements will also include an update to the patio area.

Progress photos are below:

shareDOWNTOWN Apartments | June 2020 Progress

Much progress has been made on the 63 unit apartment project Breslin Builders has provided design-build services on for Cherry Development.  The project is nearing completion with the site work progressing, unit finishes being installed, and inspections taking place.

 

 

 

 

Progress photos are below:

shareDOWNTOWN Apartments | September 2019

Concrete foundation work is progressing on the 63 unit mixed-use apartment project Breslin Builders is providing design-build services for.  The downtown located project at Casino Center and Colorado is on track for a 2nd quarter completion in 2020.

Progress photos are below:

shareDOWNTOWN Apartments | August 2019 Progress

Grading is completed and underground plumbing and site utility work is progressing on the 63 unit mixed-use apartment project Breslin Builders is providing design-build services for.  The downtown located project at Casino Center and Colorado is on track for a 2nd quarter completion in 2020.

Progress photos are below:

shareDOWNTOWN Apartments | July 2019 Progress

Site work has begun on the new multi-story mixed used apartment project in downtown Las Vegas, Nevada.  The project will have two ground floor retail spaces, enclosed on grade parking, and 3-levels of apartments above the concrete podium consisting of 63 units total.  Each unit is designed as a studio apartment containing approximately 480 square feet each.  The project also has three community/gathering rooms.  Located at the southwest corner of Casino Center Boulevard and Colorado Avenue, the project is anticipated to be completed April/May 2020.  Breslin Builders provided design-build services for the project.

Progress photos are below:

Cactus Plaza Expansion | July 2019 Progress

Work on the retail expansion at Cactus Plaza is progressing and stucco work has been completed.  The work involves the expansion of the end cap space into an existing patio area to allow more space for a future tenant improvement.  In addition to the new walls and stucco work shown in the photos below, the existing sloped patio slab was removed and a new flat slab was provided, as well as additional insulation, reworking of some minor plumbing and electrical items, and eventually the installation of new storefront systems in the existing opening and removal of the existing south facing storefront to expand the interior area.

Breslin Builders provided the original construction for the center in 2015-2016 and are providing design-build services for this new expansion work.  The work is progressing and will be completed by the end of July 2019.

Progress photos are below:

Cactus Plaza Expansion | June 2019 Progress

Work on the retail expansion at Cactus Plaza has started.  The work involves the expansion of the end cap space into an existing patio area to allow more space for a future tenant improvement.  In addition to the new walls and storefront, the existing sloped patio slab was removed and a new flat slab was provided, as well as additional insulation, reworking of some minor plumbing and electrical items, and eventually the installation of new storefront systems in the existing opening and removal of the existing south facing storefront to expand the interior area.  The existing stucco on some of the walls was also removed for the future tenant improvement work.

Breslin Builders provided the original construction for the center in 2015-2016 and are providing design-build services for this new expansion work.  The work is progressing and will be completed by the end of July 2019.

Progress photos are below:

Anthem Highlands TI | December 2018

Breslin Builders is providing demolition and tenant improvement services for the Phillips Edison & Company at their Anthem Highlands shopping center property.  They are a repeat client for Breslin Builders (we completed work at their Rainbow and Warm Springs property earlier this year).  Our design-build scope is to provide selective demolition services to remove the existing Tropical Smoothie build-out and prepare the space for a future tenant improvement.

Our scope include a ward vanilla shell TI ready for the future tenant (in this case an authorized Verizon retail store) finishes. In addition to the construction services, Breslin Builders provided the needed plans, coordinated and pulled permits with the City of Henderson (over the counter processing).  This project has a quick turn around and will be ready in January 2019.

Progress photos for stages of the work are below: