World Wide Safety Award 2023

Breslin Builders, specifically the shareDOWNTOWN at 11th project, and Tony Barras, the project manager and superintendent, were awarded the General Contractor of the Year Award for projects $12MM. World Wide Safety awarded Breslin Builders the project for our safety record during the course of the project. We take safety seriously and are honored that Breslin Builders was chosen for this award.

This was the 5th Annual WWS Awards. It was a fun night of good food, good entertainment, and connection with industry colleagues. Find out more information regarding World Wide Safety with this link.

In addition to the awards presentation, the event had an auction benefiting a new local public charter school specifically related to construction. Check out this link for more information regarding the Southern Nevada Trades High School.

shareDOWNTOWN at 11th | December 2022 Progress

Current progress includes the preparation for the stucco exterior finish, interior units getting gypsum board installed, roofing is installed, and mechanical units are set on the roof ready for connections. We are getting ready for a 1st Quarter finish so new tenants can move in.

Jackpot Joanie’s SL | November 2022 Progress

This is a newer remodel project we are well underway with for ECL Gaming. This is a remodel of the existing Irene’s tavern into a new Jackpot Joanie’s. The project involves a complete remodel of the interior and an update and a remodel of the exterior facade. The project includes new exterior framing and stucco, cutting openings in the existing CMU walls, new roofing materials installed, and a full buildout on the interior including new restrooms, a new gaming area and bar, and seating areas.

Progress photos are below:

shareDOWNTOWN – RJ Article

Breslin Builders is pleased to have partnered with Cherry Development on his past projects and looks forward to adding another one to the list. This one will be in the Historic Westside part of downtown Las Vegas at Jefferson and D St. This project will be similar to the other Share projects we have designed and constructed, but will add additional commercial space to the project, bring much needed retail style space to the area.

Check out this RJ article for the next apartment project we will be teaming up with Cherry Development to complete.

More information on shareDOWNTOWN can be found here.

601 Bridger Main Office TI | October 2022 Progress

Work is progressing on the 601 Bridger Main Level TI office project. This is a design-build project to complete the buildout of the Schwartz Building at 601 Bridger. We previously completed the upper-level law office area (entire floor) and the Brew It coffee shop (main level). This project will finish building out the main level and provide more law office space. The finishes and appearance will be similar to what we completed on the upper level.

Progress photos are below:

shareDOWNTOWN at 11th | May 2022 Progress

The 84-unit apartment project is progressing with the concrete podium columns in place and the garage slab areas being graded. Progress has been made on the perimeter CMU walls leading towards the podium form work and pour.

Progress photos are below:

shareDOWNTOWN at 11th | January 2022 Progress

Our next apartment project in downtown Las Vegas, Nevada has started! This one will be similar to the one we completed at Casino Center and Colorado, with an added floor to increase the unit count to 84 units. The project will progress throughout 2022 with an anticipated completed first part of 2023.

Bali Hai Tiki Bar | November 2021 Progress

Our design-build project at the Bali Hai Golf Course Club House, which is adding a new sports bar within an existing covered patio area, is progress towards the end.

Finishes are being installed including various tiki style materials, creating a fun place for a drink or food after (or before) your 18 holes of golf. Playing off the “tiki” theme, but also keep with the overall Polynesian theme of the club house and golf course, the new sports bar be your next stop in your experience at the Bali Hai Golf Course.

Breslin Builders has provided both design and construction of this newest addition to the clubhouse, which is a project we provided initial design-assist and construction services in the early 2000’s, and have provided various construction services over the past decades at the property.

Airport Self Storage | October 2021

Breslin Builders has been engaged to provide design-build services for a new multi-story self storage facility in the Southwest part of the Las Vegas valley. The project consists of various unit sizes across 130,000 square feet of floor space. The project is designed to take advantage of the location and will cater to both local residents, local businesses, but also the tourist and timeshare market, allowing ease of access from the airport and rental car facility.

Breslin’s in-house design group completed conceptual designs and we will be moving into the entitlement and construction documentation phases next. Construction is slated to start 3rd Quarter 2022.

Renderings of the project are below:

Lucky 7’s at Trop and Jones | September 2021 Progress

We have started the interior remodel work converting an old Irene’s Lounge into a new Lucky 7’s tavern. This project is owned by the same client that we have completed Jackpot Joanie’s for, as well as currently constructing their new corporate offices, Ron Winchell and Eclipse Gaming. Breslin Builders is providing both design and construction services for this project.

The initial phase involved gutting the existing shell space in preparation for the new work. The existing bar, kitchen, restrooms, and other related spaces have been removed to make way for the new tavern use.

Jackpot Joanie’s HS | June 2021 Update

Our latest Jackpot Joanie’s location completed for Eclipse Gaming is complete and opened today! This is our third location we have provided design-build services for Eclipse Gaming and have at least two more locations in progress. Below are photos from their pre-opening to get the place ready for there customers this afternoon. Final photos will follow once we have these ready.

Stop of by and visit their newest location at the end of Sunset and Hualapai, 6420 S. Hualapai Way, Las Vegas, Nevada.

Brew It Coffee at 601 Bridger | May 2021 Progress

Progress is well underway for a new coffee shop in downtown Las Vegas. Breslin Builders provided design-build services for the Brew It Coffee shop at 601 Bridger (corner of 6th Street and Bridger in downtown). The project is a continuation of other work we have completed over the past year including the entire upper level of the building for Schwartz Law‘s new office. We are also completing lobby and restroom upgrades on the main level, as well as creating a space for future tenant improvements on the main level.

Jackpot Joanie’s SE | March 2021 Progress

Our second design-build Jackpot Joanie’s location at Sahara and Eastern is nearing completion.  The old Dream Furniture location has been completely renovated into a new Jackpot Joanie’s location.  Breslin Builders provided full design-build services for this project.

 

Progress photos are below:

Jackpot Joanie’s HS | March 2021 Progress

The tenant improvement work for a new Jackpot Joanie’s at Hualapai and Sunset is progress into the finishes mode.  Ceiling grid, paint, FRP, and other items are being installed in this new location for Jackpot Joanie’s.

 

As with two prior Jackpot Joanie’s locations, Breslin Builders is providing full design-build services on this project also including in-house design and full general contracting services.

 

The project is anticipated to be finished in May | June 2021.

 

Progress photos are below:

601 Bridger Offices | October 2020 Progress

Our design-build offices on the second level of the 601 Bridger building, located at the southeast corner of 6th Street and Bridger Avenue in downtown Las Vegas is reaching completion.

 

The new law office project contains over 7,000 square feet of high-end finishes and methods including polished concrete floors, level 5 smooth walls, recessed and pendant lighting, high-gloss cabinet finishes, decorative wall tiles, just to name a few.  The project encompasses the entire second level of the two-story building.

 

Breslin Builders is providing both the design and construction of the project.

 

Progress photos are below:

 

Winchell’s Pub & Grill Eastern | July 2020 Progress

Breslin Builders is providing refresh and update design-build services for the existing Winchell’s Pub & Grill located at 10620 S. Eastern Ave. in Henderson, NV.  We are refreshing the kitchen area, the bar area, and the dining room areas.  Future improvements will also include an update to the patio area.

Progress photos are below: