World Wide Safety Award 2023

Breslin Builders, specifically the shareDOWNTOWN at 11th project, and Tony Barras, the project manager and superintendent, were awarded the General Contractor of the Year Award for projects $12MM. World Wide Safety awarded Breslin Builders the project for our safety record during the course of the project. We take safety seriously and are honored that Breslin Builders was chosen for this award.

This was the 5th Annual WWS Awards. It was a fun night of good food, good entertainment, and connection with industry colleagues. Find out more information regarding World Wide Safety with this link.

In addition to the awards presentation, the event had an auction benefiting a new local public charter school specifically related to construction. Check out this link for more information regarding the Southern Nevada Trades High School.

Lake Mead Storage | January 2023 Progress

Much has taken place since our last update and progress is being made on the metal framing and structure of the facility. The framing of 3rd level of this Henderson, Nevada storage facility is being completed. Mechanical, plumbing, and electrical work is progressing on the 1st and 2nd levels. Hallway systems are being installed on the 1st level.

Progress photos and a video area below:

shareDOWNTOWN at 11th | December 2022 Progress

Current progress includes the preparation for the stucco exterior finish, interior units getting gypsum board installed, roofing is installed, and mechanical units are set on the roof ready for connections. We are getting ready for a 1st Quarter finish so new tenants can move in.

Jackpot Joanie’s SL | November 2022 Progress

This is a newer remodel project we are well underway with for ECL Gaming. This is a remodel of the existing Irene’s tavern into a new Jackpot Joanie’s. The project involves a complete remodel of the interior and an update and a remodel of the exterior facade. The project includes new exterior framing and stucco, cutting openings in the existing CMU walls, new roofing materials installed, and a full buildout on the interior including new restrooms, a new gaming area and bar, and seating areas.

Progress photos are below:

601 Bridger Main Office TI | October 2022 Progress

Work is progressing on the 601 Bridger Main Level TI office project. This is a design-build project to complete the buildout of the Schwartz Building at 601 Bridger. We previously completed the upper-level law office area (entire floor) and the Brew It coffee shop (main level). This project will finish building out the main level and provide more law office space. The finishes and appearance will be similar to what we completed on the upper level.

Progress photos are below:

Lake Mead Storage | June 2022 Progress

We have started another multi-story self-storage facility in the Las Vegas valley. This 3-story single-building project is in Henderson Nevada at the Lake Mead Crossing Shopping Center at Lake Mead Parkway and Water Street.

Earthwork and initial underground utility work is currently progressing. The project is expected to be completed 2nd Quarter 2023.

Progress photos are below:

shareDOWNTOWN at 11th | May 2022 Progress

The 84-unit apartment project is progressing with the concrete podium columns in place and the garage slab areas being graded. Progress has been made on the perimeter CMU walls leading towards the podium form work and pour.

Progress photos are below:

Lucky 7’s at Trop and Jones | September 2021 Progress

We have started the interior remodel work converting an old Irene’s Lounge into a new Lucky 7’s tavern. This project is owned by the same client that we have completed Jackpot Joanie’s for, as well as currently constructing their new corporate offices, Ron Winchell and Eclipse Gaming. Breslin Builders is providing both design and construction services for this project.

The initial phase involved gutting the existing shell space in preparation for the new work. The existing bar, kitchen, restrooms, and other related spaces have been removed to make way for the new tavern use.

Brew It Coffee at 601 Bridger | May 2021 Progress

Progress is well underway for a new coffee shop in downtown Las Vegas. Breslin Builders provided design-build services for the Brew It Coffee shop at 601 Bridger (corner of 6th Street and Bridger in downtown). The project is a continuation of other work we have completed over the past year including the entire upper level of the building for Schwartz Law‘s new office. We are also completing lobby and restroom upgrades on the main level, as well as creating a space for future tenant improvements on the main level.

Jackpot Joanie’s SE | March 2021 Progress

Our second design-build Jackpot Joanie’s location at Sahara and Eastern is nearing completion.  The old Dream Furniture location has been completely renovated into a new Jackpot Joanie’s location.  Breslin Builders provided full design-build services for this project.

 

Progress photos are below: