Lotus of Siam Sahara | May 2024 Progress

Work for the Lotus of Siam restaurant remodel is in full swing now with concrete and steel work progressing. The underground work has been completed and the new wall framing will be starting. The roof penetrations for the new roof top mechanical platforms have been completed with the steel support columns installed.

This continues the prior minor remodel work we have completed for Lotus of Siam over the years, including the remodel of their current operating location on Flamingo.

Work is expected to be completed in 2024, with a final opening date to be determined.

Winchell’s Bar and Grill Restroom Add | April 2024 Update

Breslin Builders has started the restroom addition to the existing Winchell’s Bar and Grill in North Las Vegas, Nevada. This is a project for ECL Gaming, for which we also provide design-build services for their Jackpot Joanie’s and Lucky 7’s locations (as well as completed their corporate office recently).

This project adds a single-use ADA-accessible restroom in the existing enclosed patio area (a building within the patio area). Due to the interior bar configuration and the past indoor clean air requirements, the existing tavern restrooms were not legally accessible to the families wishing to dine at the restaurant. This addition will satisfy the SNHD’s access requirement allowing all to dine at the establishment.

Breslin Builders is pleased to provide continued services for ECL Gaming. The project is anticipated to be finished by July 2024.

Starbucks Lake Mead Crossings | March 2024 Update

The Starbucks shell building at Lake Mead Crossings in Henderson, Nevada continues to progress through City of Henderson approvals. This 2,160 square foot shell building will house a standard Starbucks with a drive-thru, located on an existing undeveloped pad at the Lake Mead Crossings shopping center. Breslin Builders is providing design-build services for GK Development, the owner of the center. We previously provided construction services for the Lake Mead Storage located in the same center.

Permits are anticipate for June 2024 with construction starting soon after. Renderings of the project are below.

Downtown Grand Hotel and Casino | 10 Year Anniversary

Check out this article about the 10 year anniversary of the Downtown Grand Hotel and Casino, formerly the Lady Luck Hotel and Casino. Breslin Builders provided construction services for the casino remodel and transformation, as well as for the hotel tower renovations.

Click here for Review Journal Article.

Well before the work on the east side of Third Street, we also provided design-build services for the west side, including transforming the Trolley Stop into what is now Triple George Grill, Sidebar, and Pizza Rock (originally Celebrity).

Congrats to the Downtown Grand Hotel and Casino for this achievement.

Lotus of Siam Sahara | September 2023 Progress

Breslin Builders has started the preliminary interior demolition work for the remodel of the existing Lotus of Siam restaurant at the Historic Commercial Center on Sahara Avenue in Las Vegas, Nevada. The design-build restaurant remodel will provide an updated interior, refreshed kitchen remodel, added commissary kitchen, a new lounge area, and other updates to the space. The total build-out will be roughly 11,000 square feet.

This continues the prior minor remodel work we have completed for Lotus of Siam over the years, including the remodel of their current operating location on Flamingo.

Work is expected to be completed in 2024, with a final opening date to be determined.

Dewey Parking Lot – Allegiant Stadium

As part of the ongoing improvements in the area around Allegiant Stadium, another parking option is being added to the mix. Breslin Builders is providing construction services to clear the existing site in preparation for a new parking lot use.

Progress photos of the work in progress are below:

Carter’s For Kids OSHKOSH | July 2023 Progress

Breslin Builders has been actively working on a tenant improvement remodel of an existing retail space at the Silverado Ranch Plaza at Eastern and Silverado Ranch in Las Vegas, Nevada. The former 4,288 square foot T-Mobile space is being transformed into a Carter’s For Kids and OSHKOSH co-branded location.

Breslin Builder is providing the landlord work for the tenant improvement. Worked started in June 2023 and is nearing completion in August. Dan Stuart Davis, Architect is the architect of record for the project.

Our scope includes selective demolition of the existing space, new restrooms, open retail space, and back-of-house areas ready for the tenant to install the needed sales fixture and other tenant supplied items for the retail store.

Project progression photos are below:

Gipsy Nightclub | June 2023 Progress

Our Gipsy Nightclub project keeps moving along. Interior finishes are being installed, as well as exterior site work is progressing. Breslin Builders is working with the owner on some owner updates and changes to help bring their vision for the space to reality.

Progress photos are below:

Lake Mead Storage | May 2023 Progress

We are getting closer to the finish line on this project. Exterior building finishes are nearing completion. The interiors are making great progress also. The site work is progressing with the concrete flat work being installed in preparation for new pavement.

Progress photos are below:

shareDOWNTOWN Fremont East | Grand Opening Event

Our latest design-build multi-family project, shareDOWNTOWN Fremont East (aka shareDOWNTOWN at 11th) has officially been opened and residents are making it their new home. Mayor Carolyn Goodman, Councilman Cedric Crear, and other guests and dignitaries joined the shareDOWNTOWN team for a grand opening event in the second-level courtyard area, including a few speeches and a fashion show.

More information about the property can be found here.

Check out this News3 article about the event – click here.

Lucky 7’s CS | March 2023 Progress

Our project for ECL Gaming at Craig and Simmons, Lucky 7’s CS, is almost completed. This is another remodel of an existing tavern that involved the complete remodel of the interior, fixing some structural issues along the way, and cleaning up the exterior facades.

Progress photos are below.

Jackpot Joanie’s SL | March 2023 Progress

The building is taking on a whole new look with the exterior stucco and finishes being installed. The interior work is progressing also converting this old-style tavern into a new Jackpot Joanie’s location. The only reminder of the old building is the exposed trusses being used as part of the interior decor.

Progress photos are below.

shareDOWNTOWN at 11th | March 2023 Progress

We are wrapping up our second shareDOWNTOWN project for Cherry Development. This one is shareDOWNTOWN East Fremont (at 11th and Stewart). The finishing touches on the interiors, site work, and other items are being completed.

More information about shareDOWNTOWN can be found here.

Progress photos are below:

Lucky 7’s CS | Progress February 2023

Our remodel work for a new Lucky 7’s tavern at the corner of Craig and Simmons is progressing towards a finish next month. This remodel converted the existing Sporting Chance tavern into a new Lucky 7’s location and included a complete interior remodel, as well as facade adjustments.

Progress photos area below.

« Older Entries