Eclipse Gaming Office | May 2021 Progress

Early on a Friday morning, the final slabs were poured at the Eclipse Gaming Office on Buffalo and Teco in the southwest part of the Las Vegas valley. The office area slab and the warehouse areas were completed, ready for the next steps including masonry walls.

shareDOWNTOWN Apartments | September 2019

Concrete foundation work is progressing on the 63 unit mixed-use apartment project Breslin Builders is providing design-build services for.  The downtown located project at Casino Center and Colorado is on track for a 2nd quarter completion in 2020.

Progress photos are below:

Cactus Plaza Expansion | July 2019 Progress

Work on the retail expansion at Cactus Plaza is progressing and stucco work has been completed.  The work involves the expansion of the end cap space into an existing patio area to allow more space for a future tenant improvement.  In addition to the new walls and stucco work shown in the photos below, the existing sloped patio slab was removed and a new flat slab was provided, as well as additional insulation, reworking of some minor plumbing and electrical items, and eventually the installation of new storefront systems in the existing opening and removal of the existing south facing storefront to expand the interior area.

Breslin Builders provided the original construction for the center in 2015-2016 and are providing design-build services for this new expansion work.  The work is progressing and will be completed by the end of July 2019.

Progress photos are below:

Cactus Plaza Expansion | June 2019 Progress

Work on the retail expansion at Cactus Plaza has started.  The work involves the expansion of the end cap space into an existing patio area to allow more space for a future tenant improvement.  In addition to the new walls and storefront, the existing sloped patio slab was removed and a new flat slab was provided, as well as additional insulation, reworking of some minor plumbing and electrical items, and eventually the installation of new storefront systems in the existing opening and removal of the existing south facing storefront to expand the interior area.  The existing stucco on some of the walls was also removed for the future tenant improvement work.

Breslin Builders provided the original construction for the center in 2015-2016 and are providing design-build services for this new expansion work.  The work is progressing and will be completed by the end of July 2019.

Progress photos are below:

Sobb Avenue Warehouse | November 2018 Panel Progress

The Sobb Avenue Warehouse design-build project is progressing and showing great progress this month.  The concrete tilt-up wall panels have been cured enough to be stood in place.  Bull Concrete stood the panels over a couple of days giving the building its vertical appearance.  Once stood the structural steel and panelized roof framing will begin.

Progress photos are below:

 

Sobb Avenue Warehouse | October 2018 Panel Progress

Most of the concrete tilt-up panels at the Sobb Avenue Warehouse project have been poured and are curing for placement at the site.  Soon the building will start to take shape and the next phase of work can begin, including the steel girders and the panelized roof framing system.

Progress photos below:

Rebel Oil Terminal Fire Pump | October 2018 Progress

Breslin Builders is working with Rebel Oil Company to upgrade their fire pump at their existing terminal in North Las Vegas, Nevada.  Our design-build services included a new concrete pad for the pump house equipment, electrical feeds, as well as bollard installation for vehicular protection.  This pump will tie into their existing on-site fire system to provide updated fire suppression for their fueling canopies and loading racks as required by Clark County Fire Department.

Progress photos are below:

Sobb Avenue Warehouse | September 2018 Progress

The foundation reinforcing is progressing on the new warehouse project Breslin Builders is providing design-build services for. Foundations in areas have been poured.  On-site utility installations have started also.  Grading for the panel casting slabs have been completed.

Progress photos are below:

     

Sobb Avenue Warehouse | August 2018 Progress

After many long months and coordinate efforts between the civil engineer, building, and the County, the final permits have been issued from Clark County Building and Safety.  The foundation reinforcing is progressing on the new warehouse project Breslin Builders is providing design-build services for. Off-site utility installation for the water line is progressing.

Progress photos are below:

Craig and 95 Retail | May 2018 Progress

The new retail building Breslin Builders is constructing for Dapper Development at Craig and 95 is progressing with the slab in place ready for framing.  The slab has a ribbon strip for the two future retail space underground work.  Progress photos are below: