Bali Hai Tiki Bar | November 2021 Progress

Our design-build project at the Bali Hai Golf Course Club House, which is adding a new sports bar within an existing covered patio area, is progress towards the end.

Finishes are being installed including various tiki style materials, creating a fun place for a drink or food after (or before) your 18 holes of golf. Playing off the “tiki” theme, but also keep with the overall Polynesian theme of the club house and golf course, the new sports bar be your next stop in your experience at the Bali Hai Golf Course.

Breslin Builders has provided both design and construction of this newest addition to the clubhouse, which is a project we provided initial design-assist and construction services in the early 2000’s, and have provided various construction services over the past decades at the property.

Airport Self Storage | October 2021

Breslin Builders has been engaged to provide design-build services for a new multi-story self storage facility in the Southwest part of the Las Vegas valley. The project consists of various unit sizes across 130,000 square feet of floor space. The project is designed to take advantage of the location and will cater to both local residents, local businesses, but also the tourist and timeshare market, allowing ease of access from the airport and rental car facility.

Breslin’s in-house design group completed conceptual designs and we will be moving into the entitlement and construction documentation phases next. Construction is slated to start 3rd Quarter 2022.

Renderings of the project are below:

Lucky 7’s at Trop and Jones | September 2021 Progress

We have started the interior remodel work converting an old Irene’s Lounge into a new Lucky 7’s tavern. This project is owned by the same client that we have completed Jackpot Joanie’s for, as well as currently constructing their new corporate offices, Ron Winchell and Eclipse Gaming. Breslin Builders is providing both design and construction services for this project.

The initial phase involved gutting the existing shell space in preparation for the new work. The existing bar, kitchen, restrooms, and other related spaces have been removed to make way for the new tavern use.

Mini-Storage at Horizon | July 2021 Progress

Building 2’s slab is in place, Building 1’s walls are cast, and Building 3’s slab work is progressing! Much has changed since our last post about the Mini-Storage at Horizon project. Tracks for wall framing on Building 2 are being placed. Building 1’s final slab preparation is taking place.

Gilespie Storage | June 2021 Progress

Breslin Builders has started our next self storage project in the Las Vegas valley. This one will be located at Gilespie Street just north of Silverado Ranch Boulevard. Clark County Public Works has issued the grading permit and site work is gearing up to begin. The project will consist of multiple style storage buildings including single story and multi-story buildings, a manager’s unit, along with on and off-site improvements.

This project make the 4th self-storage project we have started over the past couple of years, adding to our list of other storage projects we have completed during our 40+ years in the Las Vegas valley.

Jackpot Joanie’s HS | June 2021 Update

Our latest Jackpot Joanie’s location completed for Eclipse Gaming is complete and opened today! This is our third location we have provided design-build services for Eclipse Gaming and have at least two more locations in progress. Below are photos from their pre-opening to get the place ready for there customers this afternoon. Final photos will follow once we have these ready.

Stop of by and visit their newest location at the end of Sunset and Hualapai, 6420 S. Hualapai Way, Las Vegas, Nevada.

Brew It Coffee at 601 Bridger | May 2021 Progress

Progress is well underway for a new coffee shop in downtown Las Vegas. Breslin Builders provided design-build services for the Brew It Coffee shop at 601 Bridger (corner of 6th Street and Bridger in downtown). The project is a continuation of other work we have completed over the past year including the entire upper level of the building for Schwartz Law‘s new office. We are also completing lobby and restroom upgrades on the main level, as well as creating a space for future tenant improvements on the main level.

Eclipse Gaming Office | May 2021 Progress

Early on a Friday morning, the final slabs were poured at the Eclipse Gaming Office on Buffalo and Teco in the southwest part of the Las Vegas valley. The office area slab and the warehouse areas were completed, ready for the next steps including masonry walls.

Mini-Storage at Horizon | May 2021 Progress

A lot has changed on the mini-storage project in Henderson, Nevada being constructed for Hugh Horne of HPI. CT Equipment has been able to transform what was once a remaining parcel with a wash, black Henderson rock, and lots of large rocks and boulders into a site that will have three separate self-storage buildings. This project is slated to be completed Summer of 2022.

Desert Storage | Final Photos

Our self-storage project at Eastern and Sunridge in Henderson, Nevada is completed and has opened for business. Formerly mentioned as Easter Storage, this multi-story, multi-building complex is tucked in behind and existing retail center, completing what was a large area of undeveloped land in 2018.

Breslin Builders has become the go to general contractor for self-storage projects. This project is one of four recently projects we have either finished or have under construction in the Las Vegas valley.

Below are some photos of the project’s exterior:

Mini-Storage at Revere | Final Photos

Below are some of the final photos taken of the new self-storage project Breslin Builders has recently completed. The project is located at 4280 Revere St. in North Las Vegas. Consisting of three different buildings, one being a climate controlled three-story structure, and the other two are single story unconditioned storage buildings.

Jackpot Joanie’s SE | March 2021 Progress

Our second design-build Jackpot Joanie’s location at Sahara and Eastern is nearing completion.  The old Dream Furniture location has been completely renovated into a new Jackpot Joanie’s location.  Breslin Builders provided full design-build services for this project.

 

Progress photos are below:

Jackpot Joanie’s HS | March 2021 Progress

The tenant improvement work for a new Jackpot Joanie’s at Hualapai and Sunset is progress into the finishes mode.  Ceiling grid, paint, FRP, and other items are being installed in this new location for Jackpot Joanie’s.

 

As with two prior Jackpot Joanie’s locations, Breslin Builders is providing full design-build services on this project also including in-house design and full general contracting services.

 

The project is anticipated to be finished in May | June 2021.

 

Progress photos are below:

Mini-Storage at Horizon | Contract Award

Breslin Builders has been awarded another self-storage facility in the Las Vegas valley. This one is in Henderson, Nevada and located on Horizon Ridge Parkway. The three multi-story structures will provide a new option for self-storage in this part of the valley include a dedicated wine storage facility.

 

The site take advantage of the terrain with two of the structure having walk-out basement style buildings. The project is situated on an infill lot, the last in this area, when has upgraded exteriors and added landscape provide features to integrate into the surround neighborhood.

 

Construction will start in March 2021 and is expected to run 14-15 months before being ready for occupancy.

 

 