The Plaza – Pool Deck Renovation – Rendering

The Plaza’s pool deck renovation project is progressing.  Check out the rendering based on the owner’s concept and the design-build work Breslin Builders is providing for the project.  Working closely with the property’s management, Breslin Builders is providing both design and construction services for the pool deck renovation.  Permits have been issued and the work is well under way.  Look for an official opening the beginning of summer time.

The Plaza - Pool Deck - Conceptual Rendering

In addition to the rendering file of the project, a nice article was written about the project in the Las Vegas Sun – click here for the article.

WVC Oquendo Center Autoclave Project

Breslin Builders is providing continued design and construction services for the WVC Oquendo Center facility, located on Eastern and Oquendo in Las Vegas, Nevada, by providing the needed building modifications and additions for a new full size walk through autoclave installation.  The autoclave will allow for faster and more efficient cleaning on the various equipment, tools, and other items used during their veterinarian and medical education classed provided at the world class facility.  Breslin Builders assisted with the initial design and provided construction services for the facility.

Working with Getinge for the autoclave machine, Breslin Builders provided the needed documentation for permits from Clark County Building Department.  A new recessed pit, additional mechanical, plumbing, and electrical services to the machine, as well as a new prep sink and cleaning area are being provided within the existing facility.  Working closely with the facility managers, we are able to provide the services needed while the facility stays operational, which generally includes a new continuing education seminar each week.

Progress photos are below:

WVC Oquendo Center Autoclave 3-24-16 - 1 WVC Oquendo Center Autoclave 3-24-16 - 2 WVC Oquendo Center Autoclave 3-24-16 - 3 WVC Oquendo Center Autoclave 3-24-16 - 4 WVC Oquendo Center Autoclave 3-24-16 - 5

Redwood Warehouse Nearing Completion

The Redwood Warehouse project is nearing completion and gearing up for the owner to install their equipment and fixtures to start working the MME cultivation facility.  Breslin Builders provided design-build services for the project, converting an existing metal building vehicle storage and maintenance facility into a new MME cultivation facility.

Progress photos are below:

Redwood Warehouse Progress 3-18-16 - 4 Redwood Warehouse Progress 3-18-16 - 5 Redwood Warehouse Progress 3-18-16 - 6 Redwood Warehouse Progress 3-18-16 - 7 Redwood Warehouse Progress 3-18-16 - 8 Redwood Warehouse Progress 3-18-16 - 9 Redwood Warehouse Progress 3-18-16 - 1 Redwood Warehouse Progress 3-18-16 - 2 Redwood Warehouse Progress 3-18-16 - 3

The Plaza – Pool Deck Renovation Progressing

Work on the modernization and upgrades to The Plaza Hotel and Casino Pool Deck are well underway.  Breslin Builders is providing design-build services for the project.  Currently we are working on removing the existing concrete topping slabs, removing the old bar structures, the pool, and other items in preparation for the new and modernization work.  Additionally we are adjusting and fixing a few structural items to ensure the life of the deck area continues for well into the future.  Modernized and ADA accessible restrooms, bar, and a new pool are part of the project scope also.

In addition to the selective demolition work, Breslin Builders is working to obtain the needed City of Las Vegas renovation building permits for the balance of the work.  Given the age and uniqueness of the project, we are blending the new 2012 IBC code requirements with the original 1967 UBC requirements to come to an acceptable solution, ensuring both safety and sensibility are achieved.  The original pool portion of the structure was constructed in 1981.  Look for a summer 2016 opening.

Progress photos are below:

The Plaza Pool Deck Renovation - 38 The Plaza Pool Deck Renovation - 39 The Plaza Pool Deck Renovation - 40 The Plaza Pool Deck Renovation - 29 The Plaza Pool Deck Renovation - 30 The Plaza Pool Deck Renovation - 31 The Plaza Pool Deck Renovation - 32 The Plaza Pool Deck Renovation - 34 The Plaza Pool Deck Renovation - 35 The Plaza Pool Deck Renovation - 36 The Plaza Pool Deck Renovation - 23 The Plaza Pool Deck Renovation - 24 The Plaza Pool Deck Renovation - 26 The Plaza Pool Deck Renovation - 11 The Plaza Pool Deck Renovation - 13 The Plaza Pool Deck Renovation - 5 The Plaza Pool Deck Renovation - 6 The Plaza Pool Deck Renovation - 8 The Plaza Pool Deck Renovation - 2 The Plaza Pool Deck Renovation - 3

Redwood Warehouse MME Progress

The mechanical, plumbing, and electrical system rough-in installations are taking shape at the Redwood Warehouse MME project in the southwest part of the Las Vegas valley.  In addition, the interior and exterior CMU working is taking place also.

Progress photos are below:

Redwood Warehouse MME Progress Photos 1-7-16 - 2 Redwood Warehouse MME Progress Photos 1-7-16 - 3 Redwood Warehouse MME Progress Photos 1-7-16 - 4 Redwood Warehouse MME Progress Photos 1-7-16 - 5 Redwood Warehouse MME Progress Photos 1-7-16 - 6 Redwood Warehouse MME Progress Photos 1-7-16 - 7 Redwood Warehouse MME Progress Photos 1-7-16 - 8 Redwood Warehouse MME Progress Photos 1-7-16 - 9 Redwood Warehouse MME Progress Photos 1-7-16 - 10 Redwood Warehouse MME Progress Photos 1-7-16 - 1

 

Lo-Lo’s Restaurant Photos 1-7-16

As the project nears completion and the owner starts to add the finishing touches of tables, art work, signage, and other items for their opening, Breslin Builders is completing our last items to complete the project.  Final inspections have been received and now the owner is working on getting things ready for their opening, anticipated for later this month.

Progress photos are below:

Lo-Lo's Restaurant Progress Photos 1-7-16 - 4 Lo-Lo's Restaurant Progress Photos 1-7-16 - 5 Lo-Lo's Restaurant Progress Photos 1-7-16 - 6 Lo-Lo's Restaurant Progress Photos 1-7-16 - 7 Lo-Lo's Restaurant Progress Photos 1-7-16 - 8 Lo-Lo's Restaurant Progress Photos 1-7-16 - 9 Lo-Lo's Restaurant Progress Photos 1-7-16 - 10 Lo-Lo's Restaurant Progress Photos 1-7-16 - 11 Lo-Lo's Restaurant Progress Photos 1-7-16 - 2 Lo-Lo's Restaurant Progress Photos 1-7-16 - 3

The Plaza – Pool Deck Remodel – Vegas Inc. Article

Breslin Builders has been contracted to provide design-build remodel and upgrade services for the renovated pool deck area at The Plaza Hotel & Casino.  Anticipated to open for the 2016 Summer pool season, Breslin Builders is working closely with The Plaza to provide a unique venue fitting for The Plaza, while keeping budgets and costs in check.  Breslin Builders will be providing both design and construction services for the project.

Check out this Vegas Inc. article about the project:

http://vegasinc.com/business/gaming/2015/dec/29/plaza-renovating-its-rooftop-pool-in-downtown-las/

As plans progress we will post more information.

Lo-Lo’s Restaurant Nearing Completion

The design-build restaurant remodel project, Lo-Lo’s Chicken & Waffles, located at Rainbow and Lake Mead at the Best In The West shopping center is nearing completion with an anticipated January 2016 opening.

This project is a remodel of an existing Tony Roma’s restaurant and conversion to a new Lo-Lo’s location, the first in Nevada.  In addition to new finishes and decor to match the Lo-Lo’s style and the remodel to incorporate an outdoor dining area, we also provided full kitchen upgrades, upgrades to the electrical, plumbing, and mechanical systems, as well as ADA upgrades for the restaurant.

Progress photos are below:

Lo-Lo's Progress Photos 12-4-15 - 2 Lo-Lo's Progress Photos 12-30-15 - 13 Lo-Lo's Progress Photos 12-30-15 - 14 Lo-Lo's Progress Photos 12-30-15 - 15 Lo-Lo's Progress Photos 12-30-15 - 16 Lo-Lo's Progress Photos 12-30-15 - 1 Lo-Lo's Progress Photos 12-30-15 - 2 Lo-Lo's Progress Photos 12-30-15 - 3 Lo-Lo's Progress Photos 12-30-15 - 4 Lo-Lo's Progress Photos 12-30-15 - 5 Lo-Lo's Progress Photos 12-30-15 - 6 Lo-Lo's Progress Photos 12-30-15 - 7 Lo-Lo's Progress Photos 12-30-15 - 8 Lo-Lo's Progress Photos 12-30-15 - 9 Lo-Lo's Progress Photos 12-30-15 - 10 Lo-Lo's Progress Photos 12-30-15 - 11 Lo-Lo's Progress Photos 12-30-15 - 12

Redwood Warehouse MME Project Work Starts

The permits for the Redwood Warehouse project have been issued and the work at the site is starting to take shape.  This is one of Breslin Builder’s numerous medical marijuana cultivation facility projects we are current working on.

This project consists of the conversion of an existing 20,000 square foot warehouse into a cultivation facility, with Phase I being constructed now and a future Phase II to finish out the grow rooms as needed.

As with the others, this one is a design-build project we have provided design services for and are now providing construction services on.  This project is set to finish in April 2016.  Progress photos area below:

 

Redwood Warehouse Progress Photos 12-4-15 - 1 Redwood Warehouse Progress Photos 12-4-15 - 2 Redwood Warehouse Progress Photos 12-4-15 - 3 Redwood Warehouse Progress Photos 12-4-15 - 4 Redwood Warehouse Progress Photos 12-4-15 - 5 Redwood Warehouse Progress Photos 12-4-15 - 6

Lo-Lo’s Chicken & Waffles Progressing

The Lo-Lo’s Chicken & Waffles restaurant remodel project in northwest Las Vegas is progressing with the interior finishes starting to take shape.  The new bar canopy is being installed.  The exterior storefront and glazing is being installed.  The kitchen upgrades and remodel is also being finalized.

This project is currently anticipated to open the first of 2016.

Progress photos are below:

Lo-Lo's Progress Photos 12-4-15 - 13 Lo-Lo's Progress Photos 12-4-15 - 3 Lo-Lo's Progress Photos 12-4-15 - 4 Lo-Lo's Progress Photos 12-4-15 - 5 Lo-Lo's Progress Photos 12-4-15 - 6 Lo-Lo's Progress Photos 12-4-15 - 7 Lo-Lo's Progress Photos 12-4-15 - 8 Lo-Lo's Progress Photos 12-4-15 - 9 Lo-Lo's Progress Photos 12-4-15 - 10 Lo-Lo's Progress Photos 12-4-15 - 11 Lo-Lo's Progress Photos 12-4-15 - 12 Lo-Lo's Progress Photos 12-4-15 - 1 Lo-Lo's Progress Photos 12-4-15 - 2

Lo-Lo’s Chicken & Waffles demo work in full swing

What was once part of the dining area has been removed and preparations are making way for the future outdoor patio area at the new Lo-Lo’s Chicken & Waffles restaurant at 2040 N. Rainbow Blvd., in the northwest part of the Las Vegas valley.  The restaurant, a former Tony Roma’s, is being converted to a new Lo-Lo’s Chicken & Waffles, the first franchise location in Las Vegas.

Breslin Builders is providing design-build services for this new restaurant remodel and addition, with the demo work being to first scope of services provided.  Permits are approved with the City of Las Vegas Building Department and we will be shifting into full construction work.

We anticipate the restaurant opening by the end of 2015.

Progress photos are below:

Lo-Lo's Progress 9-16-15 - 5

Lo-Lo's Progress 9-16-15 - 6

Lo-Lo's Progress 9-16-15 - 4

Lo-Lo's Progress 9-16-15 - 3

Lo-Lo's Progress 9-16-15 - 2

Lo-Lo's Progress 9-16-15 - 7

Lo-Lo’s Chicken and Waffles on Rainbow Progressing

Breslin Builders has started the selective demolition work for the new Lo-Lo’s Chicken and Waffles restaurant at the Best in the West center at Rainbow and LaKe Mead in northwest Las Vegas. The project is a remodel of a closed Tony Roma’s restaurant into a new Lo-Lo’s Chicken and Waffles, which will be the first location in Las Vegas. The project consists of a complete kitchen remodel, bar remodel, dining room finish changes, addition of a new outdoor patio area, and other minor adjustments for the new location and brand. Some recent site photos of the progress are below. Working closely with the owner’s team, Breslin Builders has provided design-build services for the project. Look for the new new location to open in November 2015.

Lo-Lo's Progress Photos 8-27-15 - 29

Lo-Lo's Progress Photos 8-27-15 - 30

Lo-Lo's Progress Photos 8-27-15 - 31

Lo-Lo's Progress Photos 8-27-15 - 28

Lo-Lo's Progress Photos 8-27-15 - 19

Lo-Lo's Progress Photos 8-27-15 - 20

Lo-Lo's Progress Photos 8-27-15 - 17

Lo-Lo's Progress Photos 8-27-15 - 13

Zydeco Po-Boys Restaurant finishing up

Breslin Builders last restaurant in the Sears Retail building at 7th and Carson is finishing up and getting ready to open in a few weeks. As with the other two restaurants (Glutton and Vegenation), as well as the facade remodel, Breslin Builders provided design-build services for this project. Below are some progress photos of the interior finishes.

image

image

image

image

image

image

image

image

image

image

Progress on Inyo Fine Cannabis Dispensary

Breslin Builders is making progress on the construction for a new medical marijuana dispensary at the Sahara Towne Square retail center at East Sahara Avenue and Maryland Parkway. Breslin Builders is providing design-build services for this 3,000 square foot dispensary project located within an existing vacant retail space. All but the existing restroom area is being remodeled of what was once a Blockbuster Video store. The project is scheduled for completion in April/May 2015.

Inyo Fine Cannabis Dispensary Progress 08

Inyo Fine Cannabis Dispensary Progress 09

Inyo Fine Cannabis Dispensary Progress 10

Inyo Fine Cannabis Dispensary Progress 01

Inyo Fine Cannabis Dispensary Progress 02

Inyo Fine Cannabis Dispensary Progress 03

Inyo Fine Cannabis Dispensary Progress 04

Inyo Fine Cannabis Dispensary Progress 05

Inyo Fine Cannabis Dispensary Progress 06

Inyo Fine Cannabis Dispensary Progress 07

Galleria Arte Fino open for business at Town Square

Breslin Builders recently completed the new art gallery in the heart of Town Square in Las Vegas, Nevada, Galleria Arte Fino. The two story gallery space use to be a PUMA retail store. Breslin Builders provided both design and construction services for the project. The gallery houses high end paintings and sculptures for sale.

For now here are some exterior photos looking into the space. More interior photos will be posted once we have them.

Galleria Arte Fino Exterior1

Galleria Arte Fino Exterior2

Galleria Arte Fino Exterior3

Sears Retail getting closer to opening

Breslin Builders is getting closer to completing the Sears Retail project and the associated restaurants, including Glutton and Vegenation. We received meter tags from the City of Las Vegas and meters have been set by NV Energy. The long anticipate electrical work to connect the needed upgraded power is due anytime from NV Energy, based on their install schedule, which will allow us to finalize the shell and restaurant projects for final approvals and occupancy.

Zydeco Po-Boys Restaurant is taking shape also with the build-out in the rough framing, rough electrical, mechanical, and plumbing stages.

Progress photos are below:

Meter tags received

Meter tags received

Front facade view along 7th Street

Front facade view along 7th Street

Front facade view along Carson Avenue and 7th Street

Front facade view along Carson Avenue and 7th Street

Front facade view along Carson Avenue

Front facade view along Carson Avenue

Patio area for Glutton

Patio area for Glutton

Patio area for Glutton

Patio area for Glutton

Interior progress of Vegenation Restaurant

Interior progress of Vegenation Restaurant

Interior progress of Vegenation Restaurant

Interior progress of Vegenation Restaurant

Interior progress of Vegenation Restaurant

Interior progress of Vegenation Restaurant

Patio area for Vegenation

Patio area for Vegenation

Interior progress of Glutton Restaurant

Interior progress of Glutton Restaurant

Interior progress of Glutton Restaurant

Interior progress of Glutton Restaurant

Interior progress of Glutton Restaurant

Interior progress of Glutton Restaurant

Interior progress of Glutton Restaurant

Interior progress of Glutton Restaurant

Interior progress of Zydeco Po-Boys Restaurant

Interior progress of Zydeco Po-Boys Restaurant

Interior progress of Zydeco Po-Boys Restaurant

Interior progress of Zydeco Po-Boys Restaurant

Alley view of project

Alley view of project

Gear done, meter installed, ready for power

Gear done, meter installed, ready for power

Ready for power

Ready for power

Galleria Arte Fino getting finishes

Breslin Builders is putting the finishes in for the Galleria Arte Fino at Town Square. Flooring, final painting, millwork, and other items are being installed to complete this project for an anticipated March 2015 opening. The space originally was a PUMA retail store that is being converted to a two-level art gallery.

Progress photos are below:

Galleria Arte Fino Progress 150219 01

Galleria Arte Fino Progress 150219 02

Galleria Arte Fino Progress 150219 03

Galleria Arte Fino Progress 150219 04

Galleria Arte Fino Progress 150219 05

Galleria Arte Fino Progress 150219 06

Galleria Arte Fino Progress 150219 07

Galleria Arte Fino Progress 150219 08

Galleria Arte Fino Progress 150219 09

Galleria Arte Fino Progress 150219 10

Galleria Arte Fino Progress 150219 14

Galleria Arte Fino Progress 150219 15