Tag Archives: design-build

Anthem Highlands TI | December 2018

Breslin Builders is providing demolition and tenant improvement services for the Phillips Edison & Company at their Anthem Highlands shopping center property.  They are a repeat client for Breslin Builders (we completed work at their Rainbow and Warm Springs property earlier this year).  Our design-build scope is to provide selective demolition services to remove the existing Tropical Smoothie build-out and prepare the space for a future tenant improvement.

Our scope include a ward vanilla shell TI ready for the future tenant (in this case an authorized Verizon retail store) finishes. In addition to the construction services, Breslin Builders provided the needed plans, coordinated and pulled permits with the City of Henderson (over the counter processing).  This project has a quick turn around and will be ready in January 2019.

Progress photos for stages of the work are below:

Sobb Avenue Warehouse | November 2018 Framing Progress

Now that the walls are stood, the roof framing for the Sobb Avenue Warehouse project is well underway for the project.  The structural columns and girders have been placed prior to the roof framing starting.  The exterior of the wall panels are being cleaned up and patched.

Progress photos are below:

Sobb Avenue Warehouse | November 2018 Panel Progress

The Sobb Avenue Warehouse design-build project is progressing and showing great progress this month.  The concrete tilt-up wall panels have been cured enough to be stood in place.  Bull Concrete stood the panels over a couple of days giving the building its vertical appearance.  Once stood the structural steel and panelized roof framing will begin.

Progress photos are below:

 

Sobb Avenue Warehouse | October 2018 Panel Progress

Most of the concrete tilt-up panels at the Sobb Avenue Warehouse project have been poured and are curing for placement at the site.  Soon the building will start to take shape and the next phase of work can begin, including the steel girders and the panelized roof framing system.

Progress photos below:

Rebel Oil Terminal Fire Pump | October 2018 Progress

Breslin Builders is working with Rebel Oil Company to upgrade their fire pump at their existing terminal in North Las Vegas, Nevada.  Our design-build services included a new concrete pad for the pump house equipment, electrical feeds, as well as bollard installation for vehicular protection.  This pump will tie into their existing on-site fire system to provide updated fire suppression for their fueling canopies and loading racks as required by Clark County Fire Department.

Progress photos are below:

Redwood Cultivation Expansion | September 2018

Breslin Builders has been retained to continue our design-build services for the expansion work at the existing Redwood Cultivation marijuana grow facility we complete in 2016 (also as a design-build delivery method in 2015-2016).  Two additional grow rooms, one for vegetation, and one for flowering, will be added to the facility in the unfinished area remaining from Phase I of the work.  Drawings for permit are currently being prepared for issuance to the Clark County Building Department for permits.

 

Sobb Avenue Warehouse | September 2018 Progress

The foundation reinforcing is progressing on the new warehouse project Breslin Builders is providing design-build services for. Foundations in areas have been poured.  On-site utility installations have started also.  Grading for the panel casting slabs have been completed.

Progress photos are below:

     

Sobb Avenue Warehouse | August 2018 Progress

After many long months and coordinate efforts between the civil engineer, building, and the County, the final permits have been issued from Clark County Building and Safety.  The foundation reinforcing is progressing on the new warehouse project Breslin Builders is providing design-build services for. Off-site utility installation for the water line is progressing.

Progress photos are below:

Sobb Avenue Warehouse | July 2018 Progress

Grading work is progressing on the new warehouse project Breslin Builders is providing design-build services for. We are working towards final building department approvals, but we are able to get some initial grading started.  In addition to having to import to the site, we also provided on-site crushing efforts to break down the larger caliche boulders found on-site.

Progress photos are below:

Sobb Avenue Warehouse | June 2018 Progress

Breslin Builders has started the site work for the new 32,000 square footage multi-tenant Sobb Avenue Warehouse project.  Clearing and grubbing is taking place in anticipation of a final civil improvement permit.  Additionally, the site will have rock crushing and caliche removal started.  Progress photos are below:

Lotus of Siam Flamingo – Interior Photographs

Below are photographs of the continued interior remodel work and finishes to date at the new Lotus of Siam restaurant location at 620 E Flamingo Road in Las Vegas, Nevada.  While we are still working on the wine room addition in the private dining area, the balance of the restaurant has been opened and a steady stream of customers are once again enjoying the meals and experience Lotus of Siam provides.  Once we fully finish the work we will capture final images, but below are some “work in progress” photographs.

Sobb Avenue Warehouse progress

Breslin Builders has completed the construction documents and recently submitted the Sobb Avenue Warehouse project to Clark County for approvals. We anticipate an April 2018 start pending final Clark County Building Department and Fire Department approvals.

An updated rendering of the project is below.

Lotus of Siam – Wine Room Addition

Continuing with the remodel work Breslin Builders had previously completed at the Lotus of Siam Flamingo location, work on the new climatized wine room is progressing with the wall framing taking place.  The work will provide a new climatized room to enclose the existing wine racks already in place.  A new mechanical system is being provided to allow the space to be conditioned to the proper temperatures needed for the wine being stored.

Progress photos are below:

Lotus of Siam | Flamingo – Open for business

The new Lotus of Siam at 620 E. Flamingo, a remodel that Breslin Builders has recently completed for the restaurant, has opened.  We are excited to provide our design-build services at their new location.

Check out this ReviewJournal.com article about the opening – click here.

In addition to the full remodel work,  we will also be completing an additional climate controlled wine room in the private dining room.  We will also be starting the design and construction services on their previous location at Commercial Center on Sahara Avenue to renovate and restore it for operations again.

Photos of the new space are to follow also.

Lotus of Siam – RJ Article

Breslin Builders is pleased to have been able to provide design and construction services for Lotus of Siam’s new location at 620 E Flamingo Road.  We look forward to doing more work with them also including a few more upgrades at this new location, as well as the anticipated renovation and remodel work at their prior location.

Check out the Review Journal article.

Lotus of Siam to open at new Las Vegas location

Lotus of Siam – Flamingo progress

Breslin Builders is currently working on the remodel of the existing Roy’s at 620 E Flamingo for another location for the Lotus of Siam restaurant.  This location will be in addition to their prior location on East Sahara, which Breslin Builders will be remodeling after this location is completed.

Working with the owners, we are closing in the existing open kitchen with new walls and server doors, updating the bar area with new equipment, new paint, finishes, carpeting, and other similar items throughout.  Additionally, we will be providing a new wine room in the private dining area to house their extensive wine collection.  In addition to the interior remodel work we are also providing some exterior updates and repairs also.

Progress photos are below: