Gillespie Storage | June 2021 Progress

Breslin Builders has started our next self storage project in the Las Vegas valley. This one will be located at Gillespie Street just north of Silverado Ranch Boulevard. Clark County Public Works has issued the grading permit and site work is gearing up to begin. The project will consist of multiple style storage buildings including single story and multi-story buildings, a manager’s unit, along with on and off-site improvements.

This project make the 4th self-storage project we have started over the past couple of years, adding to our list of other storage projects we have completed during our 40+ years in the Las Vegas valley.

Jackpot Joanie’s SE | March 2021 Progress

Our second design-build Jackpot Joanie’s location at Sahara and Eastern is nearing completion.  The old Dream Furniture location has been completely renovated into a new Jackpot Joanie’s location.  Breslin Builders provided full design-build services for this project.

 

Progress photos are below:

Jackpot Joanie’s HS | March 2021 Progress

The tenant improvement work for a new Jackpot Joanie’s at Hualapai and Sunset is progress into the finishes mode.  Ceiling grid, paint, FRP, and other items are being installed in this new location for Jackpot Joanie’s.

 

As with two prior Jackpot Joanie’s locations, Breslin Builders is providing full design-build services on this project also including in-house design and full general contracting services.

 

The project is anticipated to be finished in May | June 2021.

 

Progress photos are below:

Mini-Storage at Revere | July 2020 Progress

Breslin Builders progresses the new self-storage project on Revere Street (south of Craig Road) in North Las Vegas.  The multi-building project, including a large 3-story facility, is slated for completion in September/October 2020.

 

Progress photos are below:

 

shareDOWNTOWN Apartments | August 2019 Progress

Grading is completed and underground plumbing and site utility work is progressing on the 63 unit mixed-use apartment project Breslin Builders is providing design-build services for.  The downtown located project at Casino Center and Colorado is on track for a 2nd quarter completion in 2020.

Progress photos are below:

shareDOWNTOWN Apartments | July 2019 Progress

Site work has begun on the new multi-story mixed used apartment project in downtown Las Vegas, Nevada.  The project will have two ground floor retail spaces, enclosed on grade parking, and 3-levels of apartments above the concrete podium consisting of 63 units total.  Each unit is designed as a studio apartment containing approximately 480 square feet each.  The project also has three community/gathering rooms.  Located at the southwest corner of Casino Center Boulevard and Colorado Avenue, the project is anticipated to be completed April/May 2020.  Breslin Builders provided design-build services for the project.

Progress photos are below:

Cactus Plaza Expansion | July 2019 Progress

Work on the retail expansion at Cactus Plaza is progressing and stucco work has been completed.  The work involves the expansion of the end cap space into an existing patio area to allow more space for a future tenant improvement.  In addition to the new walls and stucco work shown in the photos below, the existing sloped patio slab was removed and a new flat slab was provided, as well as additional insulation, reworking of some minor plumbing and electrical items, and eventually the installation of new storefront systems in the existing opening and removal of the existing south facing storefront to expand the interior area.

Breslin Builders provided the original construction for the center in 2015-2016 and are providing design-build services for this new expansion work.  The work is progressing and will be completed by the end of July 2019.

Progress photos are below:

Cactus Plaza Expansion | June 2019 Progress

Work on the retail expansion at Cactus Plaza has started.  The work involves the expansion of the end cap space into an existing patio area to allow more space for a future tenant improvement.  In addition to the new walls and storefront, the existing sloped patio slab was removed and a new flat slab was provided, as well as additional insulation, reworking of some minor plumbing and electrical items, and eventually the installation of new storefront systems in the existing opening and removal of the existing south facing storefront to expand the interior area.  The existing stucco on some of the walls was also removed for the future tenant improvement work.

Breslin Builders provided the original construction for the center in 2015-2016 and are providing design-build services for this new expansion work.  The work is progressing and will be completed by the end of July 2019.

Progress photos are below:

Rainbow Commons | June 2019 Progress

Working continues on the multi-building retail center at Sunset and Rainbow.  The corner c-store, a 7-Eleven, is complete, Building 4 (retail) is framed and rough-ins are being finalized, Building 3 (retail) is being framed with rough-ins started, and Building 5 (two-story office) is being started soon.

Progress photos are below:

Sobb Avenue Warehouse | November 2018 Framing Progress

Now that the walls are stood, the roof framing for the Sobb Avenue Warehouse project is well underway for the project.  The structural columns and girders have been placed prior to the roof framing starting.  The exterior of the wall panels are being cleaned up and patched.

Progress photos are below:

Standard Restaurant Supply | November 2018

Breslin Builders was selected to provide construction services for the Standard Restaurant Supply remodel at the existing facility at Russell Road and Valley View Boulevard.  While the scope was fairly simple and included some existing office demolition to open up more warehouse space, cut in new openings in the existing CMU walls, as well as build some new walls for their showroom and sales area expansion, we none the less had to work around an existing operating business.  Various methods including dust walls, water misting, and ventilation were used to keep the existing public areas open and safe during the work.

Progress photos below:

breslin

Sobb Avenue Warehouse | November 2018 Panel Progress

The Sobb Avenue Warehouse design-build project is progressing and showing great progress this month.  The concrete tilt-up wall panels have been cured enough to be stood in place.  Bull Concrete stood the panels over a couple of days giving the building its vertical appearance.  Once stood the structural steel and panelized roof framing will begin.

Progress photos are below:

 

Sobb Avenue Warehouse | October 2018 Panel Progress

Most of the concrete tilt-up panels at the Sobb Avenue Warehouse project have been poured and are curing for placement at the site.  Soon the building will start to take shape and the next phase of work can begin, including the steel girders and the panelized roof framing system.

Progress photos below:

Rebel Oil Terminal Fire Pump | October 2018 Progress

Breslin Builders is working with Rebel Oil Company to upgrade their fire pump at their existing terminal in North Las Vegas, Nevada.  Our design-build services included a new concrete pad for the pump house equipment, electrical feeds, as well as bollard installation for vehicular protection.  This pump will tie into their existing on-site fire system to provide updated fire suppression for their fueling canopies and loading racks as required by Clark County Fire Department.

Progress photos are below: