[ Home ]  [ About Us ]  [ Design-Build ]  [ Projects ]  [ News ]  [ Green LEED ]  [ Contact Us ]

 

 

  

[ News ] 

  

  

    

<< Back to main News page...

  

August 2009

    

Breslin Builders is starting work on a new Walgreens pharmacy at Durango and Deer Springs...

  

Construction services have started on a new free-standing Walgreens pharmacy at the northwest corner of Durango Drive and Deer Springs Way in northwest Las Vegas, Nevada.  This new 14,490 square foot store is being developed for Cottonwood Capital as part of an overall five acre retail site development master planned for the pharmacy, retail space, a fast food use, and office space, in coordination with Deer Springs Development.

 

Breslin Builders provided the overall site master plan, the building designs, and the construction documentation for the site and Walgreens as part of a design/build process.  Working closely within the standard criteria and specifications from Walgreens, the new building is being built per their latest 2009 criteria requirements.  The building elevations and site requirements are per the city of Las Vegas Town Center Design Standards, which required the project's exterior elevations and site amenities to be upgraded from a standard Walgreens project.

 

Click on the image below for a larger view of the conceptual rendering of the overall master planned site:

 

  


Top of page...

     

For more project information please contact Breslin Builders at (702) 798-3977...

  

<< Back to main News page...

 

    


[ Home ]    [ About Us ]    [ Design-Build ]    [ Projects ]    [ News ]    [ Green LEED ]    [ Contact Us ]


5525 Polaris Avenue, Suite B  Las Vegas, Nevada  89118 | (702) 798-3977 |  (702) 798-3908 FAX | License No. 18169

Copyright 2008 | Breslin Builders | All Rights Reserved | Last Updated August 17, 2009