Mini-Storage at Horizon | July 2021 Progress

Building 2’s slab is in place, Building 1’s walls are cast, and Building 3’s slab work is progressing! Much has changed since our last post about the Mini-Storage at Horizon project. Tracks for wall framing on Building 2 are being placed. Building 1’s final slab preparation is taking place.

Gillespie Storage | June 2021 Progress

Breslin Builders has started our next self storage project in the Las Vegas valley. This one will be located at Gillespie Street just north of Silverado Ranch Boulevard. Clark County Public Works has issued the grading permit and site work is gearing up to begin. The project will consist of multiple style storage buildings including single story and multi-story buildings, a manager’s unit, along with on and off-site improvements.

This project make the 4th self-storage project we have started over the past couple of years, adding to our list of other storage projects we have completed during our 40+ years in the Las Vegas valley.

Jackpot Joanie’s HS | June 2021 Update

Our latest Jackpot Joanie’s location completed for Eclipse Gaming is complete and opened today! This is our third location we have provided design-build services for Eclipse Gaming and have at least two more locations in progress. Below are photos from their pre-opening to get the place ready for there customers this afternoon. Final photos will follow once we have these ready.

Stop of by and visit their newest location at the end of Sunset and Hualapai, 6420 S. Hualapai Way, Las Vegas, Nevada.

Brew It Coffee at 601 Bridger | May 2021 Progress

Progress is well underway for a new coffee shop in downtown Las Vegas. Breslin Builders provided design-build services for the Brew It Coffee shop at 601 Bridger (corner of 6th Street and Bridger in downtown). The project is a continuation of other work we have completed over the past year including the entire upper level of the building for Schwartz Law‘s new office. We are also completing lobby and restroom upgrades on the main level, as well as creating a space for future tenant improvements on the main level.

Eclipse Gaming Office | May 2021 Progress

Early on a Friday morning, the final slabs were poured at the Eclipse Gaming Office on Buffalo and Teco in the southwest part of the Las Vegas valley. The office area slab and the warehouse areas were completed, ready for the next steps including masonry walls.

Mini-Storage at Horizon | May 2021 Progress

A lot has changed on the mini-storage project in Henderson, Nevada being constructed for Hugh Horne of HPI. CT Equipment has been able to transform what was once a remaining parcel with a wash, black Henderson rock, and lots of large rocks and boulders into a site that will have three separate self-storage buildings. This project is slated to be completed Summer of 2022.

Desert Storage | Final Photos

Our self-storage project at Eastern and Sunridge in Henderson, Nevada is completed and has opened for business. Formerly mentioned as Easter Storage, this multi-story, multi-building complex is tucked in behind and existing retail center, completing what was a large area of undeveloped land in 2018.

Breslin Builders has become the go to general contractor for self-storage projects. This project is one of four recently projects we have either finished or have under construction in the Las Vegas valley.

Below are some photos of the project’s exterior:

Mini-Storage at Revere | Final Photos

Below are some of the final photos taken of the new self-storage project Breslin Builders has recently completed. The project is located at 4280 Revere St. in North Las Vegas. Consisting of three different buildings, one being a climate controlled three-story structure, and the other two are single story unconditioned storage buildings.

Jackpot Joanie’s SE | March 2021 Progress

Our second design-build Jackpot Joanie’s location at Sahara and Eastern is nearing completion.  The old Dream Furniture location has been completely renovated into a new Jackpot Joanie’s location.  Breslin Builders provided full design-build services for this project.

 

Progress photos are below:

Jackpot Joanie’s HS | March 2021 Progress

The tenant improvement work for a new Jackpot Joanie’s at Hualapai and Sunset is progress into the finishes mode.  Ceiling grid, paint, FRP, and other items are being installed in this new location for Jackpot Joanie’s.

 

As with two prior Jackpot Joanie’s locations, Breslin Builders is providing full design-build services on this project also including in-house design and full general contracting services.

 

The project is anticipated to be finished in May | June 2021.

 

Progress photos are below:

Mini-Storage at Horizon | Contract Award

Breslin Builders has been awarded another self-storage facility in the Las Vegas valley. This one is in Henderson, Nevada and located on Horizon Ridge Parkway. The three multi-story structures will provide a new option for self-storage in this part of the valley include a dedicated wine storage facility.

 

The site take advantage of the terrain with two of the structure having walk-out basement style buildings. The project is situated on an infill lot, the last in this area, when has upgraded exteriors and added landscape provide features to integrate into the surround neighborhood.

 

Construction will start in March 2021 and is expected to run 14-15 months before being ready for occupancy.

 

 

601 Bridger Offices | October 2020 Progress

Our design-build offices on the second level of the 601 Bridger building, located at the southeast corner of 6th Street and Bridger Avenue in downtown Las Vegas is reaching completion.

 

The new law office project contains over 7,000 square feet of high-end finishes and methods including polished concrete floors, level 5 smooth walls, recessed and pendant lighting, high-gloss cabinet finishes, decorative wall tiles, just to name a few.  The project encompasses the entire second level of the two-story building.

 

Breslin Builders is providing both the design and construction of the project.

 

Progress photos are below:

 

theBLOQparq Announcement

Breslin Builders has been selected as part of the development team involved on a new and exciting, as well as unique, project being developed in the City of Henderson, Nevada at the intersection of Boulder Highway and Sunset. Chosen for our experience in similar project types, including our highly successful design-build efforts provided for the Downtown Container Park, and our relationship with Xtreme Cubes, we are ready to lend our insight, design-assist services, and ultimately be the general contractor of record for theBLOQparq project.

 

More information about the project and team can be found on their recently launched website – https://thebloqparq.com

 

We look forward to breaking ground in 2021!

 

Mini-Storage at Revere | July 2020 Progress

Breslin Builders progresses the new self-storage project on Revere Street (south of Craig Road) in North Las Vegas.  The multi-building project, including a large 3-story facility, is slated for completion in September/October 2020.

 

Progress photos are below:

 

Winchell’s Pub & Grill Eastern | July 2020 Progress

Breslin Builders is providing refresh and update design-build services for the existing Winchell’s Pub & Grill located at 10620 S. Eastern Ave. in Henderson, NV.  We are refreshing the kitchen area, the bar area, and the dining room areas.  Future improvements will also include an update to the patio area.

Progress photos are below:

« Older Entries