Huntridge Retail | June 2019 Progress

Breslin Builders, working for Dapper Construction and Dapper Development, has progressed the new two tenant restaurant building out of the ground.  The slab has been poured and the unique CMU walls are being completed.

The building, designed by BunnyFish Studios, has a very unique and custom curvilinear roof, making this a one of a kind structure.  Housing two locally recognized restaurants, Roberto’s Taco Shop and Capriotti’s Sandwich Shop, the space will be a welcomed addition to the existing Huntridge Shopping Center at Charleston Boulevard and Maryland Parkway.

Progress photos are below:

Rainbow Commons | June 2019 Progress

Working continues on the multi-building retail center at Sunset and Rainbow.  The corner c-store, a 7-Eleven, is complete, Building 4 (retail) is framed and rough-ins are being finalized, Building 3 (retail) is being framed with rough-ins started, and Building 5 (two-story office) is being started soon.

Progress photos are below:

Huntridge Retail | May 2019 Progress

Breslin Builders, working for Dapper Construction and Dapper Development, has progressed the new two tenant restaurant building out of the ground.  After a few months of existing utility relocation, site work, and underground installations, we have columns in place ready to put the slab.

The building, designed by BunnyFish Studios, has a very unique and custom curvilinear roof, making this a one of a kind structure.  Housing two locally recognized restaurants, Roberto’s Taco Shop and Capriotti’s Sandwich Shop, the space will be a welcomed addition to the existing Huntridge Shopping Center at Charleston Boulevard and Maryland Parkway.

Progress photos are below:

  

Rainbow Commons | March 2019 Progress

Breslin Builders is making vertical progress on the Rainbow Commons center on Rainbow between Sunset and the 215.  The framing for building 1, a future 7-Eleven c-store is completed.  Foundation work for building 4 is started also.

Progress photos are below:

We are hiring | Construction Estimator

We are looking for qualified candidates for an in-house construction estimator.  More information can be found on our LinkedIn job posting, as well as how to apply for the position (no in person contact please).

Interested and qualified candidates only should click here for the LinkedIn page.

Please note:  We are interested in receiving information directly from qualified applicants only.  We respectfully request that job placement services, recruiters, employment specialists, and other related services not contact us (via email, electronically, voice, or in person) for information, job placements, or candidates.

Anthem Highlands TI | December 2018

Breslin Builders is providing demolition and tenant improvement services for the Phillips Edison & Company at their Anthem Highlands shopping center property.  They are a repeat client for Breslin Builders (we completed work at their Rainbow and Warm Springs property earlier this year).  Our design-build scope is to provide selective demolition services to remove the existing Tropical Smoothie build-out and prepare the space for a future tenant improvement.

Our scope include a ward vanilla shell TI ready for the future tenant (in this case an authorized Verizon retail store) finishes. In addition to the construction services, Breslin Builders provided the needed plans, coordinated and pulled permits with the City of Henderson (over the counter processing).  This project has a quick turn around and will be ready in January 2019.

Progress photos for stages of the work are below:

Sobb Avenue Warehouse | November 2018 Framing Progress

Now that the walls are stood, the roof framing for the Sobb Avenue Warehouse project is well underway for the project.  The structural columns and girders have been placed prior to the roof framing starting.  The exterior of the wall panels are being cleaned up and patched.

Progress photos are below:

Standard Restaurant Supply | November 2018

Breslin Builders was selected to provide construction services for the Standard Restaurant Supply remodel at the existing facility at Russell Road and Valley View Boulevard.  While the scope was fairly simple and included some existing office demolition to open up more warehouse space, cut in new openings in the existing CMU walls, as well as build some new walls for their showroom and sales area expansion, we none the less had to work around an existing operating business.  Various methods including dust walls, water misting, and ventilation were used to keep the existing public areas open and safe during the work.

Progress photos below:

breslin

Sobb Avenue Warehouse | November 2018 Panel Progress

The Sobb Avenue Warehouse design-build project is progressing and showing great progress this month.  The concrete tilt-up wall panels have been cured enough to be stood in place.  Bull Concrete stood the panels over a couple of days giving the building its vertical appearance.  Once stood the structural steel and panelized roof framing will begin.

Progress photos are below:

 

Sobb Avenue Warehouse | October 2018 Panel Progress

Most of the concrete tilt-up panels at the Sobb Avenue Warehouse project have been poured and are curing for placement at the site.  Soon the building will start to take shape and the next phase of work can begin, including the steel girders and the panelized roof framing system.

Progress photos below:

Rebel Oil Terminal Fire Pump | October 2018 Progress

Breslin Builders is working with Rebel Oil Company to upgrade their fire pump at their existing terminal in North Las Vegas, Nevada.  Our design-build services included a new concrete pad for the pump house equipment, electrical feeds, as well as bollard installation for vehicular protection.  This pump will tie into their existing on-site fire system to provide updated fire suppression for their fueling canopies and loading racks as required by Clark County Fire Department.

Progress photos are below: